![Thermo Scientific Nicolet Summit OA Скачать руководство пользователя страница 67](http://html.mh-extra.com/html/thermo-scientific/nicolet-summit-oa/nicolet-summit-oa_user-manual_1105202067.webp)
Maintenance
Because the internal optics are exposed to the atmosphere when removing the source, the
desiccant should always be replaced after replacing the source.
WARNING
Avoid shock hazard.
To ensure a good ground connection and avoid shock hazard, do not use
an outlet that is connected to a conduit ground. The ground must be a
noncurrent-carrying wire connected to earth ground at the main distribution
box.
c. Plug in the power cord to the instrument and press the power button to turn on the
spectrometer.
5. Verify the spectrometer’s performance.
a. Align the spectrometer optics.
i. From the dashboard of OMNIC Paradigm software, go to Acquire Data > Diagnostics
> Align Spectrometer.
ii. Select Start to begin alignment. The screen says "Align complete" when alignment has fin-
ished successfully.
b. Calibrate the laser.
i. Go to Acquire Data > Diagnostics > Laser Calibration.
ii. Select Start to begin calibration.
Laser calibration may take several minutes to complete. When calibration is finished, the
display shows "Measurement complete" and indicates any change in laser frequency.
The instrument takes up to 12 hours to come to thermal equilibrium. For best results, re-run
alignment and calibration after the first 12 hours of operation.
c. Run the Nicolet Summit OA - PV Test workflow. The performance verification workflow uses
reference material to run a series of standard tests to verify your instrument operation and to
ensure the accuracy of your data.
i. Return to the Dashboard.
ii. Scroll to the Workflows pane and select Nicolet Summit OA - PV Test.
iii. Right click the workflow and select Run to start the workflow.
64
Nicolet Summit OA Spectrometer User Guide
Thermo Scientific
Содержание Nicolet Summit OA
Страница 7: ... This page intentionally left blank ...
Страница 45: ... This page intentionally left blank ...