CE-EMC Protection Installation Procedure
Installation
E-4
LevelPRO Installation Guide
Thermo Fisher Scientific
4.
Using the appropriate tool, screw the EMC assembly onto the detector
housing approximately six to seven rotations (see note) until the
connection is tight and the mounting holes of the EMC board housing
align with the holes in the mounting plate of the bracket assembly. Be
sure to rotate the wires that are inserted into the detector housing as the
EMC assembly is rotated to keep from damaging the wires.
Note
In order to maintain area protection, a minimum engagement of
five threads is required.
5.
Due to variances in components, extra nuts and washers have been
included in the kit to use as spacers between the EMC board enclosure
and the mounting plate. When the EMC assembly conduit fitting is
threaded into the detector housing so that the connection is secure, use
the extra nuts and washers to fill in any gap that may still exist and
tighten the mounting bolts.
A completed installation on the LevelPRO housing is shown below.
Figure E–4.
Completed installation
Содержание LevelPRO Series
Страница 2: ......
Страница 3: ...LevelPRO Continuous Gamma Level System Installation Guide P N 717760 Revision H ...
Страница 4: ......
Страница 6: ...This page intentionally left blank ...
Страница 8: ...This page intentionally left blank ...
Страница 14: ...This page intentionally left blank ...
Страница 28: ...This page intentionally left blank ...
Страница 40: ...This page intentionally left blank ...
Страница 48: ...This page intentionally left blank ...
Страница 90: ...Drawings C 42 LevelPRO Installation Guide Thermo Fisher Scientific Figure C 39 868709 HART retrofit LevelPRO ...
Страница 96: ...This page intentionally left blank ...
Страница 106: ...This page intentionally left blank ...
Страница 110: ...This page intentionally left blank ...