7
Shipping Carton
The shipping carton should be inspected upon delivery.
When received, carefully examine for any shipping dam-
age before unpacking. If damage is discovered, the
delivering carrier should both specify and sign for the
damage on your copy of the delivery receipt.
Open the carton carefully making certain that all parts are
accounted for before packaging materials are discarded.
After unpacking, if damage is found promptly report it to
the carrier and request a damage inspection promptly.
IMPORTANT: Failure to request an inspection of damage
within a few days after receipt of shipment absolves the
carrier from any liability for damage. You must call for a
damage inspection promptly.
Location
Place the unit on a level table or bench where it will be
operated, away from drafts and wide variations in ambi-
ent temperature, near a power supply source that match-
es the unit nameplate requirements. Allow clearance
around the unit for free air convection, accessory attach-
ment and user convenience.
The incubator door opens from the left side.
Thermometer Installation
The thermometer holder doubles as a vent fixture on the
top of the unit. Place the grommet in the hole at the top
of the thermometer holder. Push the thermometer, sup-
plied with the unit, through the grommet until 3-inches of
the thermometer (including the bulb) extends through the
holder. Push the holder into the vent on top of the cabinet
until about 1/4-inch of the holder is exposed.
The thermometer bulb should extend about 2-inches into
the chamber.
Turn the thermometer in its holder for easy reading.
Unpacking and Installation
Note
It may be necessary to squeeze the
3 prongs of the thermometer holder
to install it more easily.
Thermometer
Thermometer
Holder Grommet
Thermometer Holder
Thermometer Vent
(Top of Incubator)