5
Installation
Page 68
ISQ EC and ISQ EM Mass Spectrometer Operating Manual
5.5
Setting Up the Hardware
This section describes how to set up the hardware and provides information
about the instrument connectors and cables.
5.5.1
Installing the Foreline Pump
The external mechanical pump as shown in Figure 4 is placed near the
instrument and it is quiet at only 48 dB (A).
The pump size is 470 mm (length) x 158 mm (width) x 229 mm (height), and
weighs 28 kg.
It should be placed on the floor or located somewhere where its vibration
will not adversely affect instrument performance.
Figure 4: Foreline Pump
Check the foreline pump voltage setting as indicated in Figure 5. It shows a
pump configured for 110 V operation. The voltage must match that of the
supplied voltage to the MS instrument. For example, if the MS instrument is
using 110 V, it is important that the foreline pump voltage is also set to
110 V.
Содержание ISQ EC
Страница 1: ...ISQ EC and ISQ EM Mass Spectrometer Operating Manual 1R120591 0002 Revision E February 2019 ...
Страница 4: ...Page 4 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 66: ...5 Installation Page 66 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 135: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 135 ...
Страница 163: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 163 Figure 90 Venting the mass spectrometer ...
Страница 166: ...6 Operation Page 166 ISQ EC and ISQ EM Mass Spectrometer Operating Manual MS LC IC Start port Integrion RLY port ...
Страница 204: ...7 Maintenance and Service Page 204 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 228: ...12 Index Page 228 ISQ EC and ISQ EM Mass Spectrometer Operating Manual 12 Index ...
Страница 229: ...12 Index ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 229 ...
Страница 232: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...