![Thermo Scientific BF51728 Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/thermo-scientific/bf51728/bf51728_installation-and-operational-manual_1104685043.webp)
| Main Controller: 1x8 & 5x16 Segment Programmable
6-42
|
330985H01
1100°C Box Furnace
Chapter 6
Soft Start Power Limit
The soft start function limits the power delivered to the heater until it has warmed up. The
SS.PWR is the power limit applied until the PV reaches the SS.SP or the timer has
elapsed.
Delayed Switch On Timer
The timer is used to switch on the controller output power after a fixed length of time. It
could be used to turn on a process at a particular time.
It is initiated by any of the following:
Switching on power;
Momentarily pressing
and
together;
Setting the parameter T.STAT to run;
A command through serial communications;
A logic input suitably configured.
When the timer status = run, the control output is off.
When the timer status = reset, the control output is controlling.
Содержание BF51728
Страница 11: ...Safety Notes Chapter 1 1 10 330985H01 1100 C Box Furnace...
Страница 15: ...Introduction 2 14 330985H01 1100 C Box Furnace Chapter 2...
Страница 27: ...Start Up 5 26 330985H01 1100 C Box Furnace Chapter 5...
Страница 63: ...Maintenance 9 62 330985H01 1100 C Box Furnace Chapter 9...
Страница 69: ...Wiring Diagram 10 68 330985H01 1100 C Box Furnace Chapter 10...
Страница 81: ...Find out more at thermofisher com...