T
Thermo Fisher Barnstead
Pacific AFT
Pure water system
35
14. Maintenance
Your system requires regular, proper and professional maintenance.
We recommend that you secure a service contract to ensure that the necessary maintenance
work is carried out.
You then have the certainty of a high operational safety and reliability.
The service protocol appended to the service contract serves for certification that maintenance
work specified in the contract has been carried out by authorized
service company.
To ensure your system will work reliably for a long time, it must be checked, serviced and cared
for at regular time intervals in accordance with these Operating Instructions!
For this reason, the Operating Instructions must be readily available to operating and
maintenance staff at all times, and be carefully followed!
Any maintenance work which should become necessary during the validity of the guarantee is
only to be carried out by a service professional which is expressly authorized to do such work.
The operating-staff assigned should be committed to carry out daily/weekly checks.
During the agreed term of validity of the guarantee, maintenance is to be carried out weekly
according to the maintenance record sheet supplied with the Operating Instructions.
The calibration of the conductivity display is only to be carried out and recorded by customer
service.
Cleaning and disinfection of supply tanks, piping, filter housings etc. Is performed for reasons of
hygiene and has no effect on the technical condition of the system. These components must be
cleaned and disinfected whenever algae or slime are detected inside them or at least once
yearly.
The 5µm + activated carbon combi-cartridge (article no. 06.5203) and the hardness stabilization
(article no. 06.5453) in the pretreatment integrated in the system must be replaced twice yearly.
Checks or maintenance work on electrical equipment are only to be carried out
after the system has been completely separated from the electrical supply by
unplugging the mains plug and ensuring that it will not be inadvertently plugged
back in. Such work is only to be carried out by qualified electricians.
Содержание 50135178
Страница 51: ...T Thermo Fisher Barnstead Pacific AFT Pure water system 51 22 Terminal assignment 22 1 Pacific AFT 3 20 24V...
Страница 52: ...T Thermo Fisher Barnstead Pacific AFT Pure water system 52 22 2 Pacific AFT 40 48V...
Страница 53: ...T Thermo Fisher Barnstead Pacific AFT Pure water system 53...