background image

12mm Block Model

Plug the dri-bath into the properly grounded receptacle.
Insert a calibrated laboratory thermometer* into a 12 x
75mm test tube containing 1.25 mls. of solution. Place the
test tube in a well. Wait the specified time until the ther-
mometer indicates 37°C. You are ready to incubate your
tubes when the thermometer temperature has stabilized
0.5°C. 

Calibration

Equipment required:

Regular tip (slot type) .080” screwdriver

Test tube 12 x 75mm

Calibrated laboratory thermometer*

*Calibrated for 25mm immersion depth.

Pour 1.25 mls. of solution into the 12 x 75mm test tube.
Insert the thermometer into the tube and place tube in
any dri-bath well. Wait until the dri-bath has come to tem-
perature and stabilized. Insert the screwdriver into the
1/4” calibration port located in the rear of the unit. Turn
the adjusting screw clockwise to increase temperature
and counterclockwise to decrease temperature. One com-
plete turn will change the temperature approximately
10°C. Allow 10 minutes stabilization time between fine
adjustments.

7

O

PERATION

Note

Do not place dri-bath in a draft, sun-
light or near equipment which emits
heat or cold as this may result in fluc-
tuating temperatures.

Test tube liquid levels should not
exceed the level of the well depth.
(25mm). 

Placing a full load of cold tubes in the
dri-bath will extend recovery time.Only
12mm test tubes should be used in
the dri-bath to obtain optimum results.

Warning

Plug the dri-bath into the properly
grounded receptacle. Insert a calibrat-
ed laboratory thermometer* into a 12 x
75mm test tube containing 1.25 mls. of
solution. Place the test tube in a well.
Wait the specified time until the ther-
mometer indicates 37°C. You are
ready to incubate your tubes when the
thermometer temperature has stabi-
lized 0.5°C. 

Note

Unplug unit when making calibrating
adjustments.

Содержание 12200

Страница 1: ...Type 12200 Blood Bank Dri Bath Operation Manual and Parts List Model Voltage DB12215E 120 DB12215E 60 120 LT656X1 2 26 07 ...

Страница 2: ...use of this equipment Safety Information 3 Alert Signals 3 Warnings 3 Introduction 5 Performance Characteristics and Specifications 5 Intended Use 5 Function 5 Installation 5 Operation 6 10mm 60 Block Models 6 Calibration 6 12mm Block Models 7 Calibration 7 Maintenance 8 Cleaning 8 Parts List 9 Ordering Procedures 10 One Year Limited Warranty 12 2 Table of Contents ...

Страница 3: ... power supply prior to main tenance and servicing To avoid personal injury 1 Do not use in the presence of flammable or combustible materials Fire or explosion may result This device contains components which may ignite such materials 2 Caution Hot Surface Avoid Contact The block becomes hot while the unit is operating and will remain hot for some time after the unit is turned off 3 Refer servicin...

Страница 4: ...e located in the door the hearth collar in the chamber of the product or under the hot plate top Tests performed by the manufacturer indicate that there is no risk of exposure to dust or respirable fibers resulting from operation of this product under normal conditions However there may be a risk of exposure to respirable dust or fibers when repairing or maintaining the insulating materials or whe...

Страница 5: ...vironment for 10mm or 12mm test tubes containing in vitro diagnostic specimens or samples for qualitative or quantitative test procedures Please refer to the clinical laboratory method specified by the reagent manufacturer or established by medical technology for product application Function The Blood Bank Dri Bath provides incubating tempera tures in the range of Ambient Plus 5 C 60 C for 10mm or...

Страница 6: ... of the unit Turn the adjusting screw clockwise to increase temperature and counterclockwise to decrease temperature One com plete turn will change the temperature approximately 10 C Allow 10 minutes stabilization time between fine adjustments 6 Operation Note Do not place dri bath in a draft sun light or near equipment which emits heat or cold as this may result in fluc tuating temperatures Test ...

Страница 7: ...adjusting screw clockwise to increase temperature and counterclockwise to decrease temperature One com plete turn will change the temperature approximately 10 C Allow 10 minutes stabilization time between fine adjustments 7 OPERATION Note Do not place dri bath in a draft sun light or near equipment which emits heat or cold as this may result in fluc tuating temperatures Test tube liquid levels sho...

Страница 8: ...Cleaning Unplug incubator Use a moist cleaning cloth to clean the painted case and wells Dry thoroughly 8 Maintenance ...

Страница 9: ...art No Description No Req 120 Volt Models PC656X1A Control 1 EL656X1A Element 1 BK250X1A Block Heating 12MM 1 BK250X2A Block Heating 10 MM 60 Models 1 CR598X1 Cord Set 1 PLX97 Light Pilot 1 9 Parts List ...

Страница 10: ...c dealer from whom you purchased this unit or can be obtained promptly from the factory When service or replacement parts are needed we ask that you check first with your dealer If the dealer cannot handle your request then contact our Customer Service Department at 563 556 2241 or 800 553 0039 Prior to returning any materials please contact our Customer Service Department for a Return Materials A...

Страница 11: ...11 ...

Страница 12: ...g use inconsistent with written operating instructions for the product mishandling contamination overheating modification or alteration of the product by any customer or third party or iii use of replacement parts that are obtained from a party who is not an authorized dealer of Thermo Scientific prod ucts Heating elements because of their susceptibility to overheating and contamination must be re...

Отзывы: