12mm Block Model
Plug the dri-bath into the properly grounded receptacle.
Insert a calibrated laboratory thermometer* into a 12 x
75mm test tube containing 1.25 mls. of solution. Place the
test tube in a well. Wait the specified time until the ther-
mometer indicates 37°C. You are ready to incubate your
tubes when the thermometer temperature has stabilized
0.5°C.
Calibration
Equipment required:
•
Regular tip (slot type) .080” screwdriver
•
Test tube 12 x 75mm
•
Calibrated laboratory thermometer*
*Calibrated for 25mm immersion depth.
Pour 1.25 mls. of solution into the 12 x 75mm test tube.
Insert the thermometer into the tube and place tube in
any dri-bath well. Wait until the dri-bath has come to tem-
perature and stabilized. Insert the screwdriver into the
1/4” calibration port located in the rear of the unit. Turn
the adjusting screw clockwise to increase temperature
and counterclockwise to decrease temperature. One com-
plete turn will change the temperature approximately
10°C. Allow 10 minutes stabilization time between fine
adjustments.
7
O
PERATION
Note
Do not place dri-bath in a draft, sun-
light or near equipment which emits
heat or cold as this may result in fluc-
tuating temperatures.
Test tube liquid levels should not
exceed the level of the well depth.
(25mm).
Placing a full load of cold tubes in the
dri-bath will extend recovery time.Only
12mm test tubes should be used in
the dri-bath to obtain optimum results.
Warning
Plug the dri-bath into the properly
grounded receptacle. Insert a calibrat-
ed laboratory thermometer* into a 12 x
75mm test tube containing 1.25 mls. of
solution. Place the test tube in a well.
Wait the specified time until the ther-
mometer indicates 37°C. You are
ready to incubate your tubes when the
thermometer temperature has stabi-
lized 0.5°C.
Note
Unplug unit when making calibrating
adjustments.
Содержание 12200
Страница 11: ...11 ...