background image

All installations and services must be performed by qualified service personnel. 

 

Position the open end of the filter rack so as to provide access for filter replacement. Once the filter rack is 
positioned correctly, scribe a line along the inside of the securing flange on three of the sides. To scribe a line on the 
fourth side (the open end), use the open end support as a guide. 
 
Remove the filter rack and cut the return air opening in the casing. Now the filter rack can be anchored to the 
furnace with screws or pop-rivets through the securing flange of the filter rack. 
 
Connect the return air plenum to the filter rack and slide the filter into place.  Dimensions for adapting the return air 
plenum to the filter rack are provided (See Fig. 5). 

Fig. 5: A typical filter rack and dimensions for the OH6FA072D*** furnace. 

 
 
 
E.  LIMIT POSITION AND LOCATION 

 

c

WARNING:  

The predetermined  limit locations on all of the Thermo Pride oil fired furnaces 

have been tested and approved by Thermo Products, LLC. Any attempt to relocate these safety 
controls or replace these safety controls with a control that is not approved, or is incompatible, 
may result in personal injury, substantial property damage or death.

 

 
The unit listed in the table below must have the fan and limit control installed at the time of unit installation.  

Fig. 7: Limit location for OH6FA072D*** 

 

 

TABLE 2: Installation location of 
the fan and limit control for each 
furnace

Содержание OH6FA072D48R

Страница 1: ...ND LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE c WARNING IMPROPER INSTALLATION ADJUSTMENT ALTERATION SERVICE OR MAINTENANCE CAN CAUSE INJURY OR PROPERTY DAMAGE REFER TO THIS MANUAL FOR ASSI...

Страница 2: ...al injury substantial property damage or death See Page 4 cWARNING THE HEAT EXCHANGER MUST BE CLEANED BY A QUALIFIED SERVICE PERSON See Page 7 cCAUTION DO NOT ATTEMPT TO MAKE REPAIRS YOURSELF See Page...

Страница 3: ...R CONDITIONING 3 D FILTERS MOUNTED EXTERNAL TO FURNACE 3 E LIMIT POSITION AND LOCATION 4 F BURNER INSTALLATION 5 G BURNER SPECIFICATIONS AND APPLICATIONS 6 H HEAT EXCHANGER CLEANING INSTRUCTIONS 7 III...

Страница 4: ...BUSTIBLE MATERIAL and NON COMBUSTIBLE MATERIAL COMBUSTIBLE MATERIAL Material made of or surfaced with wood compressed paper plant fibers plastics or other material that will ignite and burn whether fl...

Страница 5: ...eld model FDVS 45 FVOP 415 side wall vent kit for such applications When installing the FDVS 45 FVOP 415 side wall vent kit outside combustion air must also be applied to the burner The following tabl...

Страница 6: ...ided to prevent chilled air from entering the furnace If such a damper is manually operated it must be equipped with a means to prevent operation of either unit unless the damper is in the full heat o...

Страница 7: ...he filter rack and slide the filter into place Dimensions for adapting the return air plenum to the filter rack are provided See Fig 5 Fig 5 A typical filter rack and dimensions for the OH6FA072D furn...

Страница 8: ...during shipping and helps to maintain insertion depth DO NOT remove this retainer when installing burner Fig 8 Typical location of the overfire air tap and components in burner mounting plate area Fig...

Страница 9: ...E NOZZLE SIZE GIVES THE NOMINAL FLOWRATE IN GPH FOLLOWED BY THE SPRAY ANGLE IN DEGREE S AND THE SPRAY PATTERN EITHER H FOR HOLLOW CONE OR S FOR SOLID CONE FOR EXAMPLE A NOZZLE RATED AT 0 65 GPH 100 PS...

Страница 10: ...lug removal With access to the inside of the heat exchanger through the burner area clean out openings and vent pipe connection it is possible to use a long flexible wire brush and an industrial type...

Страница 11: ...loration of materials and damage from rust or corrosion FLUE PIPE VENT PIPE OR CONNECTOR The furnace vent pipe should be inspected for signs of rust corrosion pitting or holes in pipe and leakage arou...

Страница 12: ...stem and home cWARNING To avoid injury from moving parts hot surfaces or electrical shock shut off the power to the furnace before removing any furnace access doors to service the air filters The filt...

Страница 13: ...HIMNEY W INDUCER MASONRY CHIMNEY W METAL LINER FUEL LINE FILTER DRAFT CONTROL COMBUSTION TESTS Operate burner at least 10 minutes before CO2 in stack pipe INITIAL SERVICE SERVICE SERVICE INSTALLATION...

Страница 14: ...All installations and services must be performed by qualified service personnel 11 APPENDIX A Replacement Parts List...

Страница 15: ...All installations and services must be performed by qualified service personnel 12 APPENDIX B Wiring Diagrams...

Страница 16: ...All installations and services must be performed by qualified service personnel 13...

Страница 17: ......

Отзывы: