background image

All installations and services must be performed by qualified service personnel. 

 

10 

COMBUSTION AND EFFICIENCY TESTING FOR THERMO PRIDE

OIL FIRED CENTRAL FURNACES.

Complete this form for each Thermo Pride furnace installed. Read instruction

CUSTOMER

NAME

ADDRESS

CITY, STATE

HEATING

SYSTEM

BURNER MODEL NO.

AIR SHUTTER OPENING

INS.

% OF MAX. (EST)

FURNACE MODEL

TYPE OF VENTING SYSTEM

MASONRY
CHIMNEY

METAL
CHIMNEY

SIDEWALL
POWER VENTER

MASONRY
CHIMNEY
W/INDUCER

METAL
CHIMNEY
W/INDUCER

MASONRY CHIMNEY
W/METAL LINER

FUEL LINE FILTER

DRAFT  CONTROL

COMBUSTION

TESTS

(Operate burner

at least 10

minutes before

CO2 in stack pipe

INITIAL

SERVICE

SERVICE

SERVICE

INSTALLATION

Draft Over-fire

Draft in stack pipe

Smoke number

Furnace room temp.

Gross stack temp.

Net stack temp.
(Gross stack minus
furnace room temp.)

Efficiency

Nozzle size and spray

Date

NOTES:

INSTALLER NAME & ADDRESS

manual carefully before making tests. Retain this form with furnace.

BLAST TUBE LGTH.

Tests taken by

starting tests.)

COMBUSTION CHAMBER

CONDITION

MATERIAL

FURNACE SERIAL NUMBER

Oil pump pressure

Operation of  Controls

Burner Safety Controls

Check for oil leaks

Содержание OH6FA072D48R

Страница 1: ...ND LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE c WARNING IMPROPER INSTALLATION ADJUSTMENT ALTERATION SERVICE OR MAINTENANCE CAN CAUSE INJURY OR PROPERTY DAMAGE REFER TO THIS MANUAL FOR ASSI...

Страница 2: ...al injury substantial property damage or death See Page 4 cWARNING THE HEAT EXCHANGER MUST BE CLEANED BY A QUALIFIED SERVICE PERSON See Page 7 cCAUTION DO NOT ATTEMPT TO MAKE REPAIRS YOURSELF See Page...

Страница 3: ...R CONDITIONING 3 D FILTERS MOUNTED EXTERNAL TO FURNACE 3 E LIMIT POSITION AND LOCATION 4 F BURNER INSTALLATION 5 G BURNER SPECIFICATIONS AND APPLICATIONS 6 H HEAT EXCHANGER CLEANING INSTRUCTIONS 7 III...

Страница 4: ...BUSTIBLE MATERIAL and NON COMBUSTIBLE MATERIAL COMBUSTIBLE MATERIAL Material made of or surfaced with wood compressed paper plant fibers plastics or other material that will ignite and burn whether fl...

Страница 5: ...eld model FDVS 45 FVOP 415 side wall vent kit for such applications When installing the FDVS 45 FVOP 415 side wall vent kit outside combustion air must also be applied to the burner The following tabl...

Страница 6: ...ided to prevent chilled air from entering the furnace If such a damper is manually operated it must be equipped with a means to prevent operation of either unit unless the damper is in the full heat o...

Страница 7: ...he filter rack and slide the filter into place Dimensions for adapting the return air plenum to the filter rack are provided See Fig 5 Fig 5 A typical filter rack and dimensions for the OH6FA072D furn...

Страница 8: ...during shipping and helps to maintain insertion depth DO NOT remove this retainer when installing burner Fig 8 Typical location of the overfire air tap and components in burner mounting plate area Fig...

Страница 9: ...E NOZZLE SIZE GIVES THE NOMINAL FLOWRATE IN GPH FOLLOWED BY THE SPRAY ANGLE IN DEGREE S AND THE SPRAY PATTERN EITHER H FOR HOLLOW CONE OR S FOR SOLID CONE FOR EXAMPLE A NOZZLE RATED AT 0 65 GPH 100 PS...

Страница 10: ...lug removal With access to the inside of the heat exchanger through the burner area clean out openings and vent pipe connection it is possible to use a long flexible wire brush and an industrial type...

Страница 11: ...loration of materials and damage from rust or corrosion FLUE PIPE VENT PIPE OR CONNECTOR The furnace vent pipe should be inspected for signs of rust corrosion pitting or holes in pipe and leakage arou...

Страница 12: ...stem and home cWARNING To avoid injury from moving parts hot surfaces or electrical shock shut off the power to the furnace before removing any furnace access doors to service the air filters The filt...

Страница 13: ...HIMNEY W INDUCER MASONRY CHIMNEY W METAL LINER FUEL LINE FILTER DRAFT CONTROL COMBUSTION TESTS Operate burner at least 10 minutes before CO2 in stack pipe INITIAL SERVICE SERVICE SERVICE INSTALLATION...

Страница 14: ...All installations and services must be performed by qualified service personnel 11 APPENDIX A Replacement Parts List...

Страница 15: ...All installations and services must be performed by qualified service personnel 12 APPENDIX B Wiring Diagrams...

Страница 16: ...All installations and services must be performed by qualified service personnel 13...

Страница 17: ......

Отзывы: