Section 3 – SR-2 Software Description
Controlling Sensor
Micro Rev
All
HMI Rev
All
Choices
Return, Discharge or Selectable
Factory Set
Return
Exceptions
Description
Modulation provides very smooth
and steady temperature control. Modulation is only
operational in Continuous Mode.
This feature determines the controlling sensor used
during modulation operation, either the Return Air
Temperature Sensor or Discharge Air Temperature
Sensor.
During Return Air Modulation, the discharge air
temperature is limited to the programmed floor limit.
The floor limit is equal to setpoint minus the setting
of the FreshSet Floor Limit feature. This provides
additional protection from freezing for sensitive
loads. If the discharge air temperature reaches the
floor limit, unit control will shift to the discharge air
sensor. Control will automatically revert to the return
air sensor when conditions allow.
During Discharge Air Modulation, the discharge air
temperature is controlled to the setpoint.
Although the Selectable choice appears in the
menu, it is not implemented and should not be used.
FreshSet Modulation Pull Down Option
Micro Rev
All
HMI Rev
All
Choices
Maximum or Floor Limit
Factory Set
Maximum
Exceptions
Only appears if Controlling Sensor =
Return.
Description
This feature determines the
modulation pull down control algorithm used. This
feature is only available with return air temperature
control. The floor limit algorithm is always used with
discharge air control.
If MAX is selected, modulation pull down control is
governed by the 300°F*Minute (160°C*Minute)
algorithm. During MAX pull down, the unit is in full
cool and the discharge air temperature is allowed to
drop below the programmed floor limit for a defined
period of time. This option provides the fastest pull
down while minimizing the potential for product top
freezing.
MAX pull down example: If the discharge air is 15°F
(8°C) below setpoint the unit will operate in full cool
for 20 minutes before entering modulation cool.
(e.g. 15°F x 20 minutes = 300°F*Minutes or 8°C x 20
minutes = 160°C*Minutes)
If FLOOR LIMIT is selected, modulation pull down
control is governed by the Floor Limit pull down
algorithm. During Floor Limit pull down the unit will
operate in high speed but will control the discharge
air temperature to the programmed Floor Limit.
After the pull down conditions are satisfied the unit
will switch to low speed modulation. This option
provides a fast pull down while eliminating the
potential for product top freezing with fragile
commodities.
3-37
31 January 2005
Содержание SR-2 SmartReefer2
Страница 4: ......
Страница 7: ...Tab goes here and the next page should be GREEN Section 1 Safety...
Страница 8: ......
Страница 10: ...Section 1 SR 2 Safety Information 1 2 18 January 2005...
Страница 14: ...Section 1 SR 2 Safety Information 1 6 18 January 2005...
Страница 15: ...Tab goes here and the next page should be GREEN Section 2 Hardware Description...
Страница 16: ......
Страница 48: ...Section 2 SR 2 Hardware Description 2 32 31 January 2005...
Страница 49: ...Tab goes here and the next 2 pages should be GREEN Section 3 Software Description...
Страница 50: ......
Страница 96: ...Section 3 SR 2 Software Description 3 46 31 January 2005...
Страница 97: ...Tab goes here and the next page should be GREEN Section 4 Operation...
Страница 98: ......
Страница 181: ...Tab goes here and the next 2 pages should be GREEN Section 5 Diagnostics...
Страница 182: ......
Страница 266: ...Section 5 SR 2 Diagnostics 5 84 02 February 2005...
Страница 267: ...Tab goes here and the next page should be GREEN Section 6 Service Procedures...
Страница 268: ......
Страница 270: ...Section 6 SR 2 Service Procedure Index Page 2 01 February 2005...
Страница 282: ...Section 6 SR 2 Service Procedure A01B Page 6 P41RA01B 31 January 2005...
Страница 298: ...Section 6 SR 2 Service Procedure A02A Page 12 P41RA02A 02 February 2005...
Страница 318: ...Section 6 SR 2 Service Procedure A03B Page 4 P41RA03B 30 January 2005...
Страница 338: ...Section 6 SR 2 Service Procedure A15A Page 4 P41RA15A 30 January 2005...
Страница 360: ...Section 6 SR 2 Service Procedure A46B Page 8 P41RA46B 30 January 2005...
Страница 366: ...Section 6 SR 2 Service Procedure A48A Page 6 P41RA48A 30 January 2005...
Страница 376: ...Section 6 SR 2 Service Procedure A50A Page 6 P41RA50A 31 January 2005...
Страница 394: ...Section 6 SR 2 Service Procedure F08A Page 4 P41RF08A 30 January 2005...
Страница 398: ...Section 6 SR 2 Service Procedure F09A Page 4 P41RF09A 30 January 2005...
Страница 402: ...Section 6 SR 2 Service Procedure G03A Page 4 P41RG03A 31 January 2005...
Страница 406: ...Section 6 SR 2 Service Procedure H04A Page 4 P41RH04A 30 January 2005...
Страница 407: ...Tab goes here and the next page should be GREEN Section 7 Service Information...
Страница 408: ......
Страница 410: ...Section 7 SR 2 Information 7 2 02 February 2005...
Страница 419: ...Tab goes here and the next page should be GREEN Section 8 Schematics and Wiring Diagrams...
Страница 420: ......
Страница 422: ...Section 8 SR 2 Drawings 8 2 01 February 2005...
Страница 424: ...Section 8 SR 2 Drawings 8 4 01 February 2005...
Страница 425: ...8 5...
Страница 426: ...8 6...
Страница 427: ...8 7...
Страница 428: ...8 8...
Страница 429: ...8 9...
Страница 430: ...8 10...
Страница 431: ...8 11...