44
SYSTEM CHECK LIST
All unit mounting hardware torqued to specifications.
No air gaps between unit and trailer wall.
Drain hose properly routed and secured.
Fuel tank properly installed.
Fuel lines properly routed and fuel fittings tightened securely.
Bulkhead properly designed and installed.
Battery secured correctly and all connections clean and tight.
Remote HMI mounted securely.
Run Pre-Trip Inspection (refer to Operator’s Manual).
Run unit under load for eight hours to properly break-in engine.
Release to customer.
Содержание HK-430 HO
Страница 3: ...2 Release History Released Rev 0 09 11...
Страница 10: ...9 BLANK PAGE...
Страница 12: ...11 Trailer Container Requirements...
Страница 14: ...13 Mounting Bolt Specifications and Installation Requirements...
Страница 15: ...14 Unit Dimensions...
Страница 16: ...15 HMI Remote Mount Dimensions...
Страница 17: ...16 Status Light Dimensions Option Corner Mount Version Surface Mount Version...
Страница 20: ...19 Group 31 Battery Dimensions Lug Connections Threaded Stud Connections...
Страница 22: ...21 Uncrating and Installing the Unit...
Страница 30: ...29 Installing the Fuel Tank Aluminum L Shaped 65 Gallon Option...
Страница 34: ...33 Installing the Fuel Tank Steel Rectangle 65 Gallon Option...
Страница 36: ...35 Installing the Fuel Tank Steel Rectangle 65 Gallon Option...
Страница 42: ...41 Installing the Remote Status Light Option...
Страница 44: ...43 Installing the Battery...
Страница 46: ......