© Thermo Hybaid. Issue 1.0, January 2002
9
CHAPTER 3
Px2
THERMAL CYCLER
Unpacking & Installation
3.1 Unpacking
Before unpacking the Px2, please make sure that the outer packaging is undamaged.
After unpacking, ensure all packaging and fixtures are retained. Should there ever be a requirement to
move the unit, it should always be transported in the original packing to avoid damage. Thermo
Hybaid cannot accept responsibility for any damage incurred if the unit is incorrectly packed and
transported.
N.B. If the unit is transported or stored in conditions of high humidity it must be allowed to
stabilise at normal ambient temperature before powering up the unit.
3.2 Packing List
1.
Px2 Control Chassis
2.
Px2 Block Module (optional)
3.
User Instruction Manual
4.
Mains Lead
5.
Control Thermistor Probe (0.2ml and 0.5ml gradient and standard block modules)
6.
Control Thermistor Probe Extension Lead (0.2ml and 0.5ml gradient and standard block
modules)
7.
Specific Consumable Pack
8.
RS232 Lead
NB:
The
In Situ
Flat Block Module includes a humidity chamber.
If any item is missing or damaged, contact the UK Service Department, or your local Thermo Hybaid
office/authorised distributor.
Ensure any padding between the plate inside the heated lid and the block is removed before using the
instrument.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com