© Thermo Hybaid. Issue 1.0, January 2002
11
Figure 3.1 Installing the Block Module
Thermistor Positioning
The control thermistor probe (when required) should be inserted into socket A2 to the left of the
block towards the rear of the instrument (see fig 3.2).
Ensure that the tube contains the same volume of mineral oil as the sample reaction volume, and that
the probe is immersed in the oil and not touching the wall of the reaction vessel.
Figure 3.2 Well Numbering Showing Tube Thermistor Positioning in A2
Use in Cold Rooms
The Px2 may be used in a cold room (down to 4
°
C). However, when removed to room temperature
the instrument should be allowed to equilibrate for at least two hours before being switched on. If
equilibration is not done, condensation may form within the unit and cause a short circuit.
A
H
1
12
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com