![Thermo Dynamics CWL Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/thermo-dynamics/cwl/cwl_installation-operation-and-maintenance-manual_1104266008.webp)
6
Installation
I GENERAL
This hot water steel boiler is a high quality oil fired heating units. The installation of the boiler shall be
in accordance with state and local regulations. Refer to local Installation Codes for Oil Burning
Equipment, for recommended installation practice.
II FREIGHT CLAIMS
All units must be inspected for damage upon arrival. Concealed damage claims should be filed immedi-
ately against the carrier by the consignor. The carrier is responsible for taking prompt action on all claims.
III SIZING
Replacement boilers should not be sized from the firing rate of the old boiler; a DOE sponsored study
indicated 65% of the heating units in U.S. homes are substantially oversized. A complete heat loss cal-
culation of the structure is necessary to choose the proper size unit to install. The boiler should be sized
to within 25% of the actual calculated heat loss of the structure. Over sizing will result in short cycling
and inefficient operation.
IV BOILER LOCATION
A) Boiler to be installed in a level position with clearances in accordance with NFPA 31 Table
10.6.1.
STANDARD CLEARANCES
Front 0" (leave 12" to access burner/control)
Sides 0"
Rear 0"
Chimney Connector 18"
Top 0" (leave 18" for cleaning)
Floor: Approved for installation on combustible flooring
B) Reduced clearance installations shall comply with NFPA 31 Table 10.6.2.
C) To move the unit, push against the flue box or skids. Pushing or pulling the jacket or burner
will result in damage.
D) Be sure to level the unit by inserting shims under the elevated base.
E) CWL Series - LE rear flue kit with built-in draft regulator.
Содержание CWL
Страница 2: ......
Страница 29: ...ELECTRICAL DIAGRAMS FOR CWL SERIES BOILERS 27 ...
Страница 30: ......
Страница 32: ...TDB 080 P N 595831 MET 4088 12 10 500 ...