Panel installation
13/48
- It is recommended to use quick couplings for stainless steel and screw-on or weld-
on fittings for copper pipes. The use of other materials may affect the tightness
of the joints or connections over time. It is always recommended to use Teflon for
high temperatures on the solar circuit when making connections to the boiler.
- There should always be a certified safety valve in the solar circuit. All
Thermics Energie solar stations and modules are fitted with a certified safety
valve.
Also install a metal drain at the outlet of the safety valve in a special brass
container as per regulations.
- Make sure that the thermal insulation of all the solar circuit pipes and all the fittings
can withstand high temperatures of up to 150°C.
- The heat transfer fluid supplied is specific for solar collectors and is ready for use.
It guarantees protection down to -12°C. Contains corrosion inhibitors and must
not be mixed with other fluids or diluted with water, it must only be topped up with
Thermics Energie antifreeze.
- Always install high temperature manual bleed valves at the highest points of the
solar circuit to be able to bleed the entire circuit.
- After installing the products, make sure that the pre-charge pressure of the vessel
complies with that of the project. Make sure that the probes are correctly
connected to the control unit. Make sure that the control unit is correctly
connected to the power circuit and that the parameter settings comply with those
indicated during the selection and design phase.
i. Transport and handling
In addition to the usual standard precautions to take when handling items and
products containing fragile components, you should also bear in mind the following:
- Use the factory packaging for transport and handling, which includes wooden
pallets that can be handled by a forklift truck.
- For lifting to upper floors or onto the roof by crane, use fabric slings. Connect them
directly to the pallet (recommended lifting method). If a single panel has to be
lifted, always do so by using the straps with the head with the connections facing
downwards (see figure). Alternatively, you can slide the screws (at least 2) into
the guide at the bottom of the head (under the panel) to which you can secure
hooking systems (such as eyebolts for example.
- Pay attention to movements caused by wind.
Содержание 10 DTH V2
Страница 1: ...Code 8TAV00005 INSTALLATION MANUAL 10 DTH V2 Forced circulation systems ...
Страница 8: ...Panel description 8 48 Pressure drop ...
Страница 17: ...Panel installation 17 48 Series of collectors connected with Tichelman reverse return system ...
Страница 20: ...Panel installation 20 48 ...
Страница 21: ...Panel installation 21 48 ...
Страница 25: ...Panel installation 25 48 m Flat roof installation with trestle ...
Страница 29: ...Panel installation 29 48 n Installation with brackets ...
Страница 30: ...Panel installation 30 48 ...
Страница 44: ...44 48 ...
Страница 45: ...45 48 ...
Страница 46: ...46 48 ...
Страница 47: ...47 48 ...