background image

 

 

Model 

Range 

EWH useful 

volume, l    

Average heating time T = 

45° C at 2 kW     

Installation  

IF 30 V/ IF 30 V (pro) 

30

 

26 

0 h 40 min.

 

vertical    

IF 50 V/ IF 50 V (pro) 

50

 

43 

1 h 07 min.

 

vertical    

IF 80 V/ IF 80 V (pro) 

80

 

70 

1 h 47 min.

 

vertical    

IF 100 V/ IF 100 V (pro) 

100

 

85 

2 h 14 min.

 

vertical    

IF 30 H/ IF 30 H (pro) 

30

 

26 

0 h 40 min.

 

horizontal    

IF 50 H/ IF 50 H (pro) 

50

 

43 

1 h 07 min.

 

horizontal    

IF 80 H/ IF 80 H (pro) 

80

 

70 

1 h 47 min.

 

horizontal    

IF 100 H/ IF 100 H (pro) 

100

 

85 

2 h 14 min.

 

horizontal    

4.

 

DESCRIPTION AND PRINCIPLE OF OPERATION  

The outside casing of the EWH is made of impact-resistant plastic. The inner tank is 
made  of  high-quality  austenitic  stainless  steel,  which  provides  high  corrosion  re-
sistance  and  long  operating  life.  The  space  between  the  outside  casing  and  the  inner 
tank  is  filled  with  polyurethane  foam  -  a  modern,  ecologically  clean  thermal  insula-
tion,  which  has  the  best  heat-saving  characteristics.  IF/IF  (pro)  models    have  two 
screwed nozzles: for inlet of cold water (Figure 1, p. 3) with a blue ring and for outlet 
of hot water (Figure 1, p. 2) — with a red ring, and equipped with an additional drain 
connection  (closed  with  metal  plug  button)  for  draining  the  water  and  flushing  the 
inner tank (Figure 1, p. 17). The control panel, in all models, is on the front side of the 
EWH. (Figure 1, p. 16).   

Tubular heating element (THE), thermostat and thermal switch sensors are mounted 
on the removable flange. THE is used to heat water and thermostat provides with pos-
sibility of heating temperature regulation up to +65°

С

. All models have electronic 

control with sensor adjustment. Electronics maintain automatically water temperature 
at the level set by the user. The thermostat is used for protecting against EWH over-
heating, which disconnects THE from power supply when water temperature exceeds 
95°

С

. (Fig. 3). 

 

Safety valve (Fig. 1, p. 5) operates as the check valve, ensuring protection of the water 
ingress from the water heater into the sewage system in case of pressure drop in the 
sewage system and in case of pressure rise in the tank at high water heating, as well as 
the functions of the safety valve, releasing overpressure in the tank at high water heat-
ing. During water heater operation water may leak out of the exhaust outlet pipe of the 
safety valve to relieve excessive pressure, which is made for the purpose of water 
heater safety. This outlet pipe shall remain open to the atmosphere and be installed 
constantly down.  

Drainage of water from the safety valve exhaust pipe into the drain shall be pro-

vided with installation of the corresponding EWH drainage.    

Содержание IF 100 H (pro)

Страница 1: ...gned to provide with hot water for domestic and industrial facilities having a cold water supply line pressure of not less than 0 05 MPa and not more than 0 7 MPa EWH shall be operated indoors in heat...

Страница 2: ...the inner tank Figure 1 p 17 The control panel in all models is on the front side of the EWH Figure 1 p 16 Tubular heating element THE thermostat and thermal switch sensors are mounted on the removabl...

Страница 3: ...with pressure exceeding 0 7 MPa To connect EWH to the water supply without safety valve To drain water from EWH with power switched on To use spare parts not recommended by the manufacturer To use wat...

Страница 4: ...at least 30 cm for all mod els In order to avoid damage of the user s and or third parties property in the event of a faulty hot water system it is required to install EWH in spaces with waterproofing...

Страница 5: ...recommended to supply water to EWH through filter installed on the cold water main not included in the scope of supply Do not use used flexible feed pipes Do not operate the EWH without safety valve...

Страница 6: ...operation it is recommended to install drain valve Fig 1 p 4 in accordance with Fig 1 for models not equipped with drainage pipe not in the scope of EWH supply If the water pressure exceeds 0 7 MPa a...

Страница 7: ...2 p 5 on the control panel Mode 2 kW is accompanied by the indication of a control lamp Turbo Figure 2 p 9 1 3 kW is accompanied by the indication of a control lamp Optimal Figure 2 p 8 and 0 7 kW is...

Страница 8: ...upply inlet or discharge valve a rubber hose sending the other end down the drain Open hot water tap on mixer and drain water from the EWH through the hose Remove the protective cover disconnect wires...

Страница 9: ...water No backlights of indicator lamps 1 no voltage in electric network 2 damaged power cord 3 Thermal switch ac tuated and not switched on 1 Check voltage at the electrical outlet 2 Contact a qualif...