6
THERMASOL.COM
I
800.776.0711
MicroTouch Control Installation Instructions
Read warnings on page 3. For illustrative purposes only. Consult with qualified professional for steam room construction details.
PN: 81193_NC 4/16
Recessed Control
(shown)
Silicone
(included)
5
Mud Ring Instal Sealing Control
For Recessed Control Only
(MTMR-XX and MTTR-NTS-XX)
Sealing Control
For Surface Controls Only
(MTC-XX, MTM-XX, MTT-XX, MTR-XX, MTC-NTS-XX,
MTM-NTS-XX, MTT-NTS-XX, MTR-NTS-XX)
Step 1: BEFORE TILE - Use the
supplied mud ring by attaching to
wall face using a few standard screws.
Then tile to the edge of the mud ring.
Step 2: Once finished tile is com-
pleted remove mud ring from wall.
Ensure that the total minimum depth
is 5/8” so control face sits flush to
wall. Connect cable so it is not lost
in wall. Test fit for flushness.
Step 3: IMPORTANT: Fully test the control
system prior to silicone.
Once desired fit is achieved coat back of con-
trol face with supplied silicone. Firmly press
to wall surface and wipe excess silicone from
around control. Tape into LEVEL position and
let dry for 24 hours before using steam bath.
Data
Cable
Step 1: Coat the entire groove on the control back with supplied water-
proof silicone to fully seal the control to the wall. Completely seal the
control to the wall so moisture does not collect behind it.
Step 2: Place the control on the wall pressing firmly.
(You may need to tape the control into place until the silicone dries.)
Be careful not to harm the wall or control with the tape.
Let dry for 24 hours before using steam bath.
IMPORTANT: Fully test the control system prior to silicone.
Surface Mount Control
(shown)
1/2" hole for surface mount