ULTRA-CUT 400 XT
4-10
OPERATION
Manual 0-5275
4.05 GCM 2010 First Time Operation Matching Gas Control to Lead Length
For initial operation of GCM2010 with software version 2.1 or later.
1. Before applying AC power set the Power Supply
ENABLE/DISABLE
switch on the gas control module to
DISABLE
.
2. Set Gas Selection switch to the correct position for cutting process being used.
3. Turn on AC power and set Power Supply
ENABLE/DISABLE
switch to
ENABLE
. After a short delay to establish commu-
nications, the gas control will start the Purge and priming sequence. (If torch and coolant leads were not already full of
coolant you may be required to repeat this power on cycle and add coolant until the priming is complete).
4. Once the purge sequence is finished set the Mode Switch between Run and Set Precharge. Display says “SET HOSE
LENGTH” on the first line and LENGTH xxx FEET on the second. The xxx is most likely the factory default of 175’ which
is the system maximum.
5. Press in and hold the Current Control knob. Display changes to SELECT HOSE LENGTH and second line steps downwards
from 175’ to 50’ in 25’ increments. As soon as the correct length is displayed, release the knob.
6. Set the Mode Switch back to Run.
7. The initial/first time set up is complete and does not have to be done again unless the Gas Control or it’s main PC Board
is replaced.
4.06 GCM 2010 Sequence Of Operation
For first time operation see previous steps, “First Time Operation...”
1. Set the Plasma Power Supply
Enable / Disable
switch to
Disable
.
!
DANGER
Always shut off input power to the system
before changing or inspecting torch parts.
a. Change the torch parts if necessary.
b. Set the Plasma Power Supply
Enable / Disable
switch (on the Gas Control Module) to
Enable
. The Module performs
purges of 15 seconds, 11 seconds, and another 11 seconds. This removes water from the torch parts.
2. Select the desired plasma and shield gas by setting the Gas Selection switch to the desired position. 2 seconds after
gas selection, the module purges the new gas(es) through the leads.
3. Set the preflow gas pressure.
a. Set the MODE switch to SET PREFLOW.
b. Use the PREFLOW control knob to set preflow gas pressure. Refer to the torch manual for pressure settings.
4. Set the plasma and shield gas pressures and flows.
a. Set the MODE switch to SET PLASMA & SHIELD.
b. Use the PLASMA and SHIELD control knobs, pressure gauges, and flow meters to set plasma and shield gas pres-
sures and flows. Refer to the torch manual for pressure settings.
c. In installations using water shield, use the H
2
O MIST control knob and flow meter to set water flow rate. Refer to the
torch manual for flow rates.
5. Use the AMPERAGE SET-UP control knob to set the desired amperage output. The module will update the amperage
every 2 seconds after the last adjustment to the knob. The module keeps the set point in memory.
6. Place the MODE switch to the RUN position.
7. Set the Plasma Power Supply
Enable / Disable
switch (on the Gas Control Module) to
Enable
. The Module performs
purges of 15 seconds, 11 seconds, and another 11 seconds. This removes water from the torch parts.
Содержание Ultra-Cut 300 XT
Страница 6: ...This Page Intentionally Blank...
Страница 10: ...TABLE OF CONTENTS This Page Intentionally Blank...
Страница 15: ...ULTRA CUT 400 XT Manual 0 5275 SAFETY INSTRUCTIONS 1 5 This Page Intentionally Blank...
Страница 88: ...ULTRA CUT 400 XT OPERATION Manual 0 5275 This Page Intentionally Blank...
Страница 106: ...ULTRA CUT 400 XT REPLACEMENT PARTS Manual 0 5275 This Page Intentionally Blank...
Страница 114: ...ULTRA CUT 400 XT TORCH INFORMATION Manual 0 5275 This Page Intentionally Blank...
Страница 130: ...ULTRA CUT 400 XT APPENDIX Manual 0 5275 APPENDIX 8 CCM CPU PCB Layout Test Point Test Point Art A 11675_AB...
Страница 132: ...ULTRA CUT 400 XT APPENDIX Manual 0 5275 APPENDIX 9 CCM I O PCB Layout Test Point Test Point Art A 11676_AC...
Страница 134: ...ULTRA CUT 400 XT APPENDIX Manual 0 5275 APPENDIX 10 Pilot PCB Layout Art A 11677 Test Point Test Point...
Страница 136: ...ULTRA CUT 400 XT APPENDIX Manual 0 5275 APPENDIX 11 Relay and Interface PCB Layout Test Point Test Point Art A 11678_AB...
Страница 138: ...ULTRA CUT 400 XT APPENDIX Manual 0 5275 APPENDIX 12 Display PCB Layout Test Point Test Point Art A 11679...
Страница 139: ...ULTRA CUT 400 XT Manual 0 5275 APPENDIX A 25 Display PCB Test Points TP1GND TP2 5VDC TP3 24VDC...
Страница 140: ...ULTRA CUT 400 XT APPENDIX Manual 0 5275 APPENDIX 13 System Bias PCB Layout Test Point Test Point Art A 11680...
Страница 142: ...ULTRA CUT 400 XT APPENDIX Manual 0 5275 APPENDIX 14 Main Inverter Bottom PCB Layout Test Point Test Point Art A11681_AB...
Страница 144: ...ULTRA CUT 400 XT APPENDIX Manual 0 5275 APPENDIX 15 Main Inverter Top PCB Layout Test Point Test Point Art A11682_AB...
Страница 146: ...ULTRA CUT 400 XT APPENDIX Manual 0 5275 APPENDIX 16 Control and Fault PCB Layout Test Point Test Point Art A11683_AB...
Страница 148: ...ULTRA CUT 400 XT APPENDIX Manual 0 5275 APPENDIX 17 Cap Bias Bottom PCB Layout Art A 11685_AB...
Страница 149: ...ULTRA CUT 400 XT Manual 0 5275 APPENDIX A 35 APPENDIX 18 Cap Bias Top PCB Layout Art A 11686_AB...
Страница 150: ...ULTRA CUT 400 XT APPENDIX Manual 0 5275 APPENDIX 19 Suppressor PCB Layout Art A 11684_AB...
Страница 201: ...ULTRA CUT 400 XT Manual 0 5275 APPENDIX A 87 This Page Intentionally Blank...
Страница 213: ......