CUTMASTER 42
OPERATION 4-4 Manual 0-5141
G. Select Current Output Level
Set the desired current output level.
A
120V 15A
120V 20A
230V 20A
24
40
20
20
30
27
120V, 15A
24
40
20
20
30
27
24
40
440
20
20
30
7
277
00
230V, 20A
24
20
27
24
20
7
27
40
20
30
A
4
30
120V, 20A
40
20
30
30
30
30
A
24
40
440
20
20
7
277
A
24
2
A
4
22
0
40
20
30
24
20
A
A
A
27
A#09697_AA
4.03 Sequence of Operation
The following is a typical sequence of operation for this power supply.
1. Place the ON / OFF switch on the power supply to ON (up) position (Red indicator lamp is illuminated).
a. AC indicator
turns on; fan turns on.
NOTE
During initial power up, there will be a delay of about 2 seconds before the AC Indicator light will illuminate
and the pre-flow gas and fan starts. The gas will automatically flow from torch for approximately 10 seconds
(only after the AC Indicator lamp is illuminated) (The AC Indicator lamp and fan turns on approximately 2
seconds after the ON/OFF switch is enabled), this is a process that makes sure all inputs (gas, input power,
torch connection, and torch parts) are acknowledged for proper operation.
2. Wear protective clothing, including welding gloves and appropriate eye protection (see table 1-1). Place tip on
work piece and pull trigger. Arc will initiate and start cutting material.
• Standoff Cutting With Hand Torc
h
Содержание 42 CUTMASTER
Страница 4: ...TABLE OF CONTENTS...
Страница 24: ...This page left blank intentionally...
Страница 38: ...This page left blank intentionally...
Страница 44: ...Notes...
Страница 45: ...This Page Intentionally Blank...