32
6.02 HF TIG & Lift TIG Welding
•
Connect work lead to positive terminal
•
Connect TIG torch to negative terminal
•
Switch machine on
•
Set weld current.
•
Connect remote control device. A remote control device is required for use during LIFT
TIG and HF TIG operation. See section 4.01, section 2 “
Remote Control Socket
”, for
complete details of the remote device.
•
Use the Scroll Buttons to move to the parameter to be set. The LED will show which
function is being adjusted on the weld sequence graph. Use the control knob to adjust each
parameter.
•
Set
PRE-FLOW
time
•
Set
HOT START
current
•
Set
POST-FLOW
time
•
Set
WELD
current
•
Set
POST-FLOW
time
Slope Mode Parameters if required
•
Set
INTIAL CUR
current
•
Set
UP SLOPE
time
•
Set (WELD)
PEAK CUR
current
•
Set
BASE
current
•
Set
DOWN SLOPE
time
•
Set
CRATER CUR
current
Pulse Mode parameters if required
•
Set
PULSE WIDTH
% for
PEAK CURRENT
•
Set PEAK CURRENT
•
Set
PULSE FREQ
Commence welding
Содержание 250TS DC CC
Страница 2: ......
Страница 4: ...4 PAGE LEFT INTENTIONALLY BLANK ...
Страница 22: ...22 PAGE LEFT INTENTIONALLY BLANK ...
Страница 54: ...54 APPENDIX A INTERCONNECT DIAGRAM ...
Страница 55: ...55 ...
Страница 57: ...57 Figure 11 Location of PCB WK 4921 ...