THERMAFLOW LTD | THERMAFLOW® ELECTRIC COMBINATION BOILER | 

Tel: 0870 850 5207 

  

26

 
 

2.7.5 Heating system commissioning 

 

Make sure the boiler and heating system is completely full of water. (SEE ABOVE SECTION 7.2) 

 

Turn on both 24Hr & Interrupted power supplies. Allow approximately 120 - 300 minutes to bring the 
boiler up to temperature (depending on model). Check that all external controls, are calling for heat. 

 

Fully open all thermostatic and lock shield valves on each radiator. 

 

The aqua stat, positioned at the bottom of the boiler is pre-set to

 25ºC

 (

It must remain at this setting

 

Allow this system to reach maximum temperature then switch off both electrical supplies at the isolators. 
Drain the system rapidly while still hot.  
 
Fill and vent the system as described in section 7.2  “Filling the central heating circuit” Add inhibitor as 
required refer to section 3.8 “Corrosion Inhibitor” 

 

Set to the initial cold fill design pressure, using the external draining tap. Refer to table 1, and section 3.9  

 
NOTE:

  The system fill pressure may require to be recharged once or twice in the first two to 

three weeks after the initial commissioning of the boiler due to oxygen and air content in the 
system being expelled through the automatic air eliminator.  
 
There should be no further need to re-pressurise the system after this period. If the system 
requires continuous re-pressurisation, there may be a leak in the installation. 

 

2.7.6 Completion 

 

Set any external heating control to the desired settings.  
 

2.7.7 INSTRUCT THE USER 

 

Instruct and demonstrate the isolating switches then advise the user of the efficient and safe operation of 
the boiler.  

 

Instruct and demonstrate the operation of any heating system controls. 

 

Advise the user on the use and maintenance of any scale reducer or water softener and pass on any 
relevant instructional documents. 

 

Advise the user that to ensure continued efficient and safe operation of the appliance, it is 

recommended

 that it is checked and serviced at regular intervals. The frequency of servicing will depend 

on the particular installation and usage, but in general once a year should be enough. 

 

Any servicing should be carried out by a person competent to do so. 

 

Advise the user of the precautions necessary to prevent damage to the system and building in the event 
of the heating system being out of use during frost and freezing conditions. 

 

Reminder- leave these instructions with the user. 

 

Advise the user that the logbook should be completed by the engineer on completion of commissioning. 

Failure to do so will invalidate the warranty

. The user must sign the log book and retain it for future 

reference. 

 

Содержание TH12-210U MRK 2

Страница 1: ...est standards so we are pleased to offer our customers a comprehensive first year guarantee and a second year parts guarantee In the instruction envelope is to be found your guarantee registration car...

Страница 2: ...Position 12 2 2 2 Boilers in a compartment 13 2 2 3 Clearances allow for external primary heat transfer kit 14 2 3 1 General notes 14 2 3 2 Safety valve 14 2 3 3 Pressure Temperature Gauge 14 2 3 4 Pu...

Страница 3: ...1 3 2 4 Checking the hot water blending valve 31 3 2 5 Checking the concentration of corrosion inhibitor 32 3 2 6 Preventing pump seizure in summer 32 3 2 7Checking correct operation of electrical com...

Страница 4: ...320KG 405KG WARNING BEFORE OBTAINING ACCESS TO TERMINALS ALL SUPPLY CIRCUITS MUST BE DISCONNECTED The TH9 has 3 and the TH12 has 4 heating elements fitted Size 16 in length and are manufactured from...

Страница 5: ...e man lift DO NOT LIFT THE APPLIANCE BY ATTACHED PIPE WORK OR COMPONENTS In certain situations it may be required to use a mechanical handling aid Take care to avoid trip hazards slippery or wet surfa...

Страница 6: ...laced if required or any of the other components 0 6 Water Connections There are six water connections to be made when installing the Thermaflow They are as follows 1 Flow and return connections to th...

Страница 7: ...purposes The combination boiler is able to provide room heating as part of an under floor or central heating system and domestic hot water direct from the cold water supply without the need for second...

Страница 8: ...to do so Note if the pressure gauge indicates a loss of pressure that is less than 60 KPA 0 9 bar YOU MUST CONTACT YOUR INSTALLER unless you have been instructed by your installer on how to re pressur...

Страница 9: ...ending valve and heat exchanger 8b 22mm bend CH Flow 8c 22mm bend CH Flow 9 Primary Expansion vessel 10a Tee for external primary transfer kit 10b Tee for cold water circuit 10c Tee for cold water cir...

Страница 10: ...ntent Primary 216 248 328 Water Content Domestic Secondary 2 Litres 0 44 Gallons Primary Expansion Vessel 25 Litres 5 5 Gallons 35 Litres 7 7 Gallons Secondary Expansion Vessel 0 5 Litres 0 11 Gallons...

Страница 11: ...front case of the boiler 2 1 4 ELECTRICAL SUPPLY Power supply and wiring The power supply to the premises must meet the minimum requirements of the unit being installed with special attention given t...

Страница 12: ...MCB should be readily accessible and installed at the origin of the supply to the boiler It should be identified as to its use Means of disconnection should be readily accessible and adjacent to the a...

Страница 13: ...al requirements for cupboards or compartment design are given in the current issue of BS6798 The doorway opening should be of sufficient size to allow for easy removal of the boiler Where the boiler i...

Страница 14: ...ing system exceeds the maximum quoted in table 1 Data an additional expansion vessel should be connected into the system as close as possible to the central heating return connection of the boiler Ref...

Страница 15: ...essure will be determined by the volume and pressure of the incoming cold water supply 2 4 4 Hard water areas In areas where the water is Hard more than 200 mg litre it is recommended that a proprieta...

Страница 16: ...om side of the safety relief valve This must be extended from the safety relief valve with not less than 15mm O D metal pipe to discharge in a visible position outside the building facing downwards pr...

Страница 17: ...al heating then a separate 3 amp supply is not required for the controls as the controls are supplied via the 6 amp MCB in the control box marked No 17 on the boiler schematic on page 9 of this instru...

Страница 18: ...UT OUT MANUAL RESET 3 RD STAGE HIGH LIMIT CUT OUT MANUAL RESET TAMPER PROOF CONTROL THERMOSTAT SET TO 25 C REMOVE LINKS AND FIT OFF PEAK CONTROL IF E10 OR EXTERNAL PRIMARY HEAT SOURCES ARE BEING LINKE...

Страница 19: ...the Thermaflow boiler Connections onto main wiring terminal on boiler The Off Peak Control allows you to time the boiler to charge during the reduced rate periods on wet electric central heating tari...

Страница 20: ...er Solar Pump T14 Common L T9 CHP 2 1 C 1 C 2 11 12 14 A2 0 90 C Control Thermostat on Thermaflow Boiler Solid Fuel Relay on Thermaflow Boiler 0 50 C Control Thermostat at Solid Fuel Boiler Wiring Cir...

Страница 21: ...All Connections are 240 VAC 0 90 C Control Thermostat on Thermaflow Boiler 0 50 C Control Thermostat at Solid Fuel Boiler Solar Controller 2 11 T14 Common L Solar Pump 2 C 1 C 1 A2 11 12 12 14 A2 14 P...

Страница 22: ...linking a solid fuel appliance to the Thermaflow boiler 0 50 C Control Thermostat fitted to flow pipe at solid fuel or wood burning appliance 1 T2 Pump at Solid Fuel Boiler 0 50 C ControlThermostat fi...

Страница 23: ...isable to fit the off peak control when using a wet electric tariff other than Domestic Economy 2000 IMPORTANT If the boiler is connected to Scottish Power Domestic Economy 2000 tariff it requires a p...

Страница 24: ...d yellow earth sleeve Make the earth cable of a greater length so that if the cable is strained the earth would be the last to become disconnected CAUTION IT IS ESSENTIAL TO MAKE SURE THE POLARITY IS...

Страница 25: ...the boiler is operating correctly IMPORTANT MAKE SURE THE BOILER AND SYSTEM IS COMPLETELY FULL OF WATER AND ALL AIR IS ELIMINATED BEFORE TURNING ON ANY OF THE POWER SUPPLIES TO THE BOILER Take care no...

Страница 26: ...omatic air eliminator There should be no further need to re pressurise the system after this period If the system requires continuous re pressurisation there may be a leak in the installation 2 7 6 Co...

Страница 27: ...INUITY POLARITY SHORT CIRCUIT AND RESISTANCE TO EARTH CHECKS MUST BE REPEATED USING A SUITABLE MULTI METER Type of fault Check No domestic hot water or central heating 230 240V Supply 24HR 230 240V Su...

Страница 28: ...1 5 Bar No Yes Increase Pressure Is there continuity through 2nd stage and 3rd stage master high limit manual re set safety thermostats No Yes Re set or replace thermostat Is there continuity through...

Страница 29: ...alling for heat No Adjust the setting Is temperature above setting on aqua stat Should be set to 25o C No Re check when temperature increases Check thermostat and lock shield Valves on radiators are o...

Страница 30: ...ture setting of 25 C Is domestic pump operating correctly Are the pump valves in the open position No Yes Open the pump valves If they are open replace the pump Is there circulation through the primar...

Страница 31: ...of the boiler Its function is to take up expansion in the hot water pipe work and so protect the blender from damage The pressure can be accurately checked with the pressure relieved on the other side...

Страница 32: ...to free the pump 3 2 7Checking correct operation of electrical components WARNING BEFORE OBTAINING ACCESS TO TERMINALS ALL SUPPLY CIRCUITS MUST BE DISCONNECTED 3 2 8 Low pressure switch To check corr...

Страница 33: ...il in an over heat condition the fault must be rectified before the appliance is turned back on for use If a failure has occurred contact Thermaflow Ltd for spares and advice 3 2 12 Checking the heati...

Страница 34: ...Panels 2 Solar Pump Station 3 Solar Expansion Vessel 4 Discharge Tank 5 External Primary Transfer Kit 6 Thermaflow Electric Combi 7 Hot and Cold Demand 8 Space Heating 9 Primary Expansion Vessel F C B...

Страница 35: ...FLOW 35 L N E Supply Manual Reset H L Thermostats Automatic Air Eliminators at high points on pipe work Pump FE Tank Solid Fuel Stove Gravity Radiator Thermaflow external primary heat transfer Pump se...

Страница 36: ...4 1 3 EXTERNAL PRIMARY HEAT TRANSFER EQUIPMENT External Primary Heat Transfer Equipment Flow connection on Thermaflow boiler 36 Flow from Solar from Solar Flow from Return Wood Burner Wood Burner The...

Отзывы: