English 4
1. Remove conversion cap with a 7/8" socket or wrench.
2. Read the letters on the stem. You will see “NAT” at the
bottom of the stem. Snap-out the plunger from bottom
of the conversion cap.
3. Flip the stem over to the "LP" end, and snap the
plunger back into the cap, as shown.
4. Re-install conversion cap, configured for LP gas, back
into top of the regulator.
Replace the Burner Orifices
1. Use a 7 mm or a 9/32” socket with 1/4” nut driver to
reach down through the jet holders and remove the
Natural Gas orifice from the burner’s jet holder
.
2. Five orifices are stamped “1.15” (1.15 mm orifice
diameter) and one orifice is stamped “1.25” (1.25 mm
orifice diameter).
Replace the right-front burner orifice (
XHI
) with the
1.25 mm LP burner orifice. Replace the remaining
STAR
®
burner jet orifices with one of the 1.15 mm LP
jet orifices.
•
All of the replacement orifices in the conversion kit
have straight threads (not pipe threads) and do not
require thread sealing compound.
IMPORTANT: DO NOT
install the 1.25 mm LP orifice at
any other burner location than the right-front position.
3. Perform a gas leakage test of each orifice and
associated supply tube fittings. See
“Check for Gas
Leaks” on page 6
.
•
Leak-checking should occur after the orifice
conversion is complete, and before the burner is
reassembled and tested.
LP
NA
T
Brass Cap
Sealing Washer
Plunger
Regulator Body
1.15 x 5
1.25 x 1
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.25
1.25
1.25
Содержание Professional PRO-HARMONY PRD36
Страница 95: ...Español 31 ...