Installation Instructions
English | 14 |
Vent cover bracket installation
1. Assemble the 3 pieces of the vent cover bracket using
4 - 4.2 x 8 mm screws provided. The assembled bracket
should be sized to it inside the upper vent cover.
C
D
A
B
A. Vent cover bracket assembly
B. Upper vent cover
C. 4.2 x 8 mm screws
D. Centerline
2. Position vent cover bracket on wall about
1
⁄
8
” (3.0 mm)
away from the ceiling.
3. Mark the hole locations.
A
B
C
D
E
A. 8 x 40 mm drywall anchors
B. Centerline on wall
C. Vent cover support bracket
D. 5 x 45 mm screws
E. Centerline of bracket
4. Drill 3/8” (9.5 mm) holes for wall anchors and insert
anchors lush with the wall.
Complete Installation
1. Determine and make all necessary cuts in the wall for
the vent system. Install the vent system before installing
the hood. See “Venting Requirements” section.
2. Determine the required height for the home power
supply cable and drill a 1
1
⁄
4
” (3.2 cm) hole at this location.
3. Run the home power supply cable according to the
National Electrical Code or CSA Standards and local
codes and ordinances. There must be enough
1
⁄
2
”
conduit and wires from the fused disconnect (or
circuit breaker) box to make the connection in the
hood’s electrical terminal box.
NOTE: Do not reconnect power until installation is
complete.
4. Use caulk to seal all openings.
Installing the range hood
1. Using 2 or more people, hang the blower housing on 2
mounting screws through the mounting slots on back of
the hood.
2.
Install 2 - 5 x 45 mm lower mounting screws with lat
washers and tighten.
B
A
A Upper mounting screws
B Security screws
3. Tighten the upper installation screws.
4. Using 2 or more people, lift the hood drawer beneath
the motor housing. Insert the hood drawer pins
into the housing lower slots. Once the four pins are
already inserted, the hood drawer stands hanging.
5. Secure the drawer with seven screws.
6. Untie the drawer connector and extend it to the upper
side of the blower housing.