background image

©2013 Thermaco, Inc. All rights reserved  •  Patented/Patents Pending  •  Specifications subject to change without notice

Thermaco, Inc. • 646 Greensboro St. • Asheboro, N. C. 27204-2548 • Phone (336) 629-4651

MNL-ASTPS14000 12

Big Dipper

®

 AST System

Wiring Diagram

NOTE:

220-240V Units (International Units) have the 

following wire color changes:

On the POWER SUPPLY CORD:

The Black Wire becomes Brown

The White Wire becomes Blue

The Green Wire becomes Yellow/Green

Wiring Diagram For

Big Dipper

®

 Model W-250-AST

1

2

3

4

5

TIMER

MOTOR

HEATER

THERMOSTAT

GREEN

WHITE

BLACK

WHITE

WHITE

BLACK

BLACK

WHITE

WHITE

WHITE

POWER SUPPLY CORD

BLACK

BLACK

FULLY INSULATED

QUICK CONNECT

PIGGY-BACK

CONNECTOR

FULLY INSULATED

FEMALE CONNECTOR

BLACK

RED

RED

INTERCHANGE FULLY INSULATED

QUICK CONNECTORS TO CHANGE

HEATER OPERATING MODE. RED

WIRE TO THERMOSTAT GIVES

SIMULTANEOUS HEATER/MOTOR

OPERATION.  BLACK WIRE TO

THERMOSTAT GIVES CONTINUOUS

HEATER OPERATION.

NEON

LAMP

GREEN

GREEN

RING TERMINALS TO GROUND STUD

ON MOTOR MOUNT BRACKET

GROUND WIRE ATTACHED

TO HEATER

PLUG/PIN

CAP/SOCKT

SWITCH CONNECTOR

BLACK

BLACK

MOTOR

TEST

SWITCH

+

-

C

NO

RECYCLE

NC

SOLENOID

COIL

INTERLOCK

SWITCH

1
2

BLACK

A

4

B

3

C

D

4

3

2

1

A

B

2

ZONE

REV

DESCRIPTION

C

REVISIONS

1

DATE

D

APPROVED



MATERIAL (UNLESS NOTED)

FINISH (UNLESS NOTED)

646 GREENSBORO STREET

PO BOX 2548, ASHEBORO, NC 27203

VOICE 336-629-4651 FAX 336-626-5739

Decimals

.XX +/- .03

.XXX +/- .015

Unless otherwise specified

Dimensions are in inches

Tolerances

Angular

• •••• •••••••

CHECKED

SIZE

REV. NO.

DWG NO.

PART NO.

C

SCALE NTS

RELEASE DATE 05/10/05

SHEET  1  OF  1

ENGINEERING

DRAWN

DATE

THIRD ANGLE PROJECTION

B. KYLES                          05/10/05

B. KYLES                          05/10/05

5

WD-250-AST

WIRING DIAGRAM FOR W-250-AST

AND W-750-AST BIG DIPPER

D-2

1

ADDED NEON LAMP

10/17/06

BWK

ALL

2

12/13/07

BWK

ALL

3

03/01/11

BWK

D-2

4

03/17/11

BWK

ALL

5

06/02/11

BWK

Содержание Big Dipper W-250-AST

Страница 1: ...00 633 4204 V 336 629 4651 F 336 626 5739 E mail info thermaco com Online www big dipper com Installation Operation Instructions For the Big Dipper W 250 AST Automatic Solids Transfer AST Series Unit...

Страница 2: ...Phone 336 629 4651 MNL ASTPS14000 2 Table of Contents Table of Contents AST System Overview 3 AST System Maintenance 5 AST Timer Operation 6 AST System Troubleshooting 7 How To Reverse AST System Ope...

Страница 3: ...self cleaning operation activating the skimming wheel at a user set time Only the cleaned water exits the unit and flows into the facility drain lines Incidental food solids less than 1 25 mm in diame...

Страница 4: ...mer on the unit is no longer operating and should be replaced If pressing the button does nothing then there may be a problem with the motor assembly Please contact Thermaco or your local service agen...

Страница 5: ...cumulated solids Be sure to spray down both the inside and outside surfaces of the strainer assembly E Check the thickness of the grease layer at the top of the unit If there is more than a 1 2 12 mm...

Страница 6: ...allation is complete the Big Dipper unit needs to be set for the proper automatic self cleaning operation for the facility The Big Dipper W 250 AST model is equipped with one 1 24 Hour 96 Event time c...

Страница 7: ...5 minutes per day There is a Power Indicator Light under the Timer which indicates that Power is reaching the unit If this light is not Red power is not reaching the unit 2 Remove the lid and clean aw...

Страница 8: ...er AST System Unit Operation ALWAYS UNPLUG UNIT BEFORE REMOVING LID SYSTEM WILL NOT OPERATE UNLESS CENTER MODULE IS IN PLACE 1 Unlatch the Unit lid Pull the side wings outward 2 Lift the center module...

Страница 9: ...sible Assure that outlet pipe has at least a slope of 1 4 per foot 2 cm per meter Use only sweep connections Don t reduce the pipe sizing on the outlet piping Don t install P trap on outlet connection...

Страница 10: ...ad height is greater than 6 feet 1 95 m NOTE Drawing for reference only Equipment must be installed in compliance with all applicable laws regu lations and codes including plumbing codes Installation...

Страница 11: ...lectrical circuit controlled by a ground fault circuit breaker There is a Power Indicator Light that will glow Red if power is being fed to the unit If this light is off power is not reaching the unit...

Страница 12: ...ULLY INSULATED FEMALE CONNECTOR BLACK RED RED INTERCHANGE FULLY INSULATED QUICK CONNECTORS TO CHANGE HEATER OPERATING MODE RED WIRE TO THERMOSTAT GIVES SIMULTANEOUS HEATER MOTOR OPERATION BLACK WIRE T...

Страница 13: ...Thermaco Inc 646 Greensboro St Asheboro N C 27204 2548 Phone 336 629 4651 MNL ASTPS14000 13 Big Dipper AST System Electrical Components Safety Switch Part MSS 7 Motor Part M 58 Heater Part H 8 Thermo...

Страница 14: ...vers In Place Big Dipper AST Lid Components With Wheel Cover Removed Note W 250 AST system requires one 1 Hinged Skimming Wheel Cover Motor Electrical Cover Timer Cover Grease Collector Strainer Baske...

Страница 15: ...h Part MJS 1 Energy Saver Heater Switch Part ESHS 1 Big Dipper AST System Component Identification Big Dipper AST System Component Identification Timer Cover Part MTC 1 Wheel Cover Part MSC 1 Wheel Wi...

Страница 16: ...Units THERMOSTAT 1 per unit PART TSTAT 4 INTERNAL FLOW CONTROL PART MFC 25 FOR W 250 AST LID GASKET PART RG 7 WIPER BLADES PART PB 3 W 250 AST requires two 2 WHEEL WIPER ASSEMBLY PART WWA 4 WHEEL DRI...

Страница 17: ...s Thermaco shall not be respon sible for damage to products resulting from vault flooding sewer line back up pumping or lift station failure ambient water flow or other sources of water damage This wa...

Отзывы: