Therma-tek TCTYG36 Скачать руководство пользователя страница 4

INSTALLATION  AND SAFETY GUIDELINES 

 

CLEARANCES 
 

 

The  unit  must  be kept clear  of all  combustibles. 

 

The  unit  must  be installed  with  the 4” legs  supplied  for  proper operation. 

 

Minimum  clearance  from  combustible  construction: 

 

 

 

 

 

Back     0” 

 

 

 

 

 

 

Sides   0” 

 

Minimum  clearance  from  non-combustible: 

 

Back     0” 

 

 

 

 

 

 

Sides   0” 

 

LEVELING 
 

A carpenter’s  spirit  level  should  be placed  on the  cooking  surface  and the unit  leveled  side-to-side,  and front 
to back. If it  is  not level,  burner  combustion  may  be erratic  or the unit  may  not function  efficiently. 
 

AIR SUPPLY  AND VENTILATION 
 

The  area around  the  appliance  must  be kept clear  to avoid  any  obstructions  of  the flow  of  combustion  and 
ventilation  air  as well  as for ease of maintenance,  service,  and proper appliance  operation.  Keep clearance 
for  openings  into  the  combustion  chamber  and adequate  air  supply.   Means  must  be provided  for  any 
commercial,  heavy  duty-cooking  appliance  to exhaust  combustion  wastes to the outside  of  the building. 
 
Air  movement  should  be checked during  installation.   Strong  exhaust  fans  in  the hood or in  the  overall  air 
conditioning  system  can  produce a slight  draft  in  the room,  which  can interfere  with  pilot  or burner 
performance.   If  pilot  or burner  problems  persist  make  up air  openings  or baffles  may  have  to be provided  in 
the  room. 
 
Filters  and drip  troughs  should  be part of any  industrial  hood, but  consult  local  codes before  constructing 
and installing  any  hood.  The  duct system,  exhaust  hood, and filter  bank must  be cleaned  on a regular  basis 
and kept free  of grease. 
 

ALTITUDE 
 

The  appliance  input  rating  (BTU/hr)  is  for elevations  up to 2000 feet.   For elevations  above 2000 feet,  the 
rate should  be reduced 4% for each  1000 feet  above sea level.   The correct  orifices  are installed  at the 
factory  if  the  operating  altitude  is  known  at the  time  of sale. 
 
 

 

 
 
 
 

Содержание TCTYG36

Страница 1: ...TEPPAN YAKI OWNERS MANUAL AND INSTALLATION INSTRUCTIONS Made in U S A MODEL TCTYG36 shown...

Страница 2: ...NY OTHER APPLIANCE FOR YOUR SAFETY If you smell gas 1 Shut off gas to appliance 2 Extinguish any open flame 3 If odor continues immediately call your gas supplier Consult your local gas supplier for i...

Страница 3: ...he equipment warranty and result in a potentially hazardous condition The appliance and its individual shut off valve must be disconnected from the gas supply system during any pressure testing of tha...

Страница 4: ...adequate air supply Means must be provided for any commercial heavy duty cooking appliance to exhaust combustion wastes to the outside of the building Air movement should be checked during installati...

Страница 5: ...ly and blow them out with compressed air to clear any dirt particles threading chips or any other foreign matter before installing a service line Those particles will clog orifices when gas pressure i...

Страница 6: ...llation along with a dining table or counter The design of this counter and installation should only be performed by those experienced with this type of equipment Notice The griddle must be installed...

Страница 7: ...cated on the manifold is open Light the pilot and adjust flame to approximately 3 4 high SHUTDOWN Nightly shutdown Turn burner valves and thermostat to off position pilots will remain lit Complete shu...

Страница 8: ...nd food particles with a cloth Wash with hot soapy water and then rinse with vinegar and water solution Then rinse again with clean water Re oil with shortening or liquid frying compound Remove grease...

Страница 9: ...ressure setting 5 Clean tube Pilot burner will not ignite 1 Pilot blocked or dirty 2 Pilot adjusting screw closed 1 Clean pilot 2 Open adjust flame length HOW TO OBTAIN SERVICE For warranty service co...

Страница 10: ...s from installation b Rubber seals light bulbs andgaskets 90 days from installation c Cast iron parts 120days 7 This states the exclusive remedy against Therma Tek relatingto the product s whetherin c...

Отзывы: