ab DeVELOPER
ab DeVELOPER
USER GUIDE
USER GUIDE
FIG. 15
FIG. 16
REPLACING RESISTANCE BANDS
Lay a Pulley over the first Resistance Band and insert the Pulley Axle through the first Pulley before laying
the next Pulley over the second Resistance Band and inserting the Pulley Axle through the second
Pulley. Repeat for the third Pulley. Push the Pulley Axle all the way through and screw on the Acorn Nut
[see Fig. 15].
Important:
Once the Acorn Nuts have been tightened by hand, securely tighten the two Nuts at
either end of the Pulley Axle by using two no. 13 wrenches (not provided) (see Fig. 16).
Hook Resistance Bands to Rail Hooks at the top of the Rail [see Fig. 17].
Turn the Rail Assembly over with the Foam Rollers facing up and insert the Rail Cover and screw into
place [Fig. 18 & 19].
FIG. 17
FIG. 18
FIG. 19
17
REPLACING RESISTANCE BANDS
Connect the Seat Connector to the Rail Assembly by aligning the 4 holes in the Rail Assembly with the 4
holes in the Hinge Bracket. Insert the 4 Button Head Screws and tighten securely with the supplied Allen
Wrench [see Fig. 20].
This completes the replacement of the Resistance Band (s).
FIG. 20
18
Содержание Total FLEX AB Developer
Страница 1: ......
Страница 2: ...ab DeVELOPER ab DeVELOPER U S E R G U I D E U S E R G U I D E NOTES...