The Installation Supervisor must be experienced with
conveyor and qualified in the mechanics of the
equipment and enforce safe working procedures for the
protection of the crew, customer, and customer’s
property.
Receiving & Site Preparation
General
TGW Systems Natrix Shoe Sorter are shipped in subassemblies. These subassemblies are
packaged to guard against damage in shipment, when handled properly.
Examination immediately following unloading will show if any damage was caused during
shipment. If damage is evident, claims for recovery of expenses to repair damage or replace
components must be made against the carrier immediately. While unloading, a check must be
made against the Bill of Lading, or other packing lists provided, to confirm full receipt of listed
items.
•
TAKE CARE DURING THE REMOVAL OF EQUIPMENT FROM THE
CARRIER. Remove small items and boxes first. Pull and lift only on the
skid, not on the frame, cross member or any part of the equipment.
See examples below of packing units or structures.
Preparation of Site
After the conveyor is received, move it to the installation site or designated dry storage area as
soon as possible. Clean up all packing material immediately before parts get lost in it. Loose
parts should remain in the shipping boxes until needed.
Prior to starting assembly of the conveyor, carefully check the installation path to be sure there
are no obstructions that will cause interference. Check for access along the path needed to
bring in bed sections and components closest to the point where they are needed. It is often
necessary to give the area along the system path a general cleanup to improve installation
efficiency, access and accuracy.
WARNING
CAUTION
Revision Date: 12/10/2014
Page
27
of
111
Содержание Natrix
Страница 1: ...INSTALLATION OPERATION MAINTENANCE MANUAL Natrix Shoe Sorter Revision Date February 5 2015 ...
Страница 18: ...Natrix IOM Revision Date 12 10 2014 Page 18 of 111 ...
Страница 19: ...Natrix IOM Symbols and Units Revision Date 12 10 2014 Page 19 of 111 ...
Страница 29: ...Natrix IOM Pictures of packing units or structures continued Revision Date 12 10 2014 Page 29 of 111 ...
Страница 39: ...Natrix IOM Revision Date 12 10 2014 Page 39 of 111 ...
Страница 46: ...Natrix IOM Sorter Link Chain Revision Date 12 10 2014 Page 46 of 111 ...
Страница 48: ...Natrix IOM Blank page for placement Revision Date 12 10 2014 Page 48 of 111 ...
Страница 59: ...Natrix IOM Monitoring of Chain Tension Picture Revision Date 12 10 2014 Page 59 of 111 ...
Страница 60: ...Natrix IOM Replace Sliding Shoe Revision Date 12 10 2014 Page 60 of 111 ...
Страница 62: ...Natrix IOM Blank page for placement Revision Date 12 10 2014 Page 62 of 111 ...
Страница 66: ...Natrix IOM Blank page for placement Revision Date 12 10 2014 Page 66 of 111 ...
Страница 68: ...Natrix IOM Replace Divert Switch Assembly Revision Date 12 10 2014 Page 68 of 111 ...
Страница 72: ...Natrix IOM Adjust Switch Blade Revision Date 12 10 2014 Page 72 of 111 ...
Страница 76: ...Natrix IOM Replace Electrical Components Revision Date 12 10 2014 Page 76 of 111 ...
Страница 85: ...Natrix IOM Charge End Chain Tensioning Unit Revision Date 12 10 2014 Page 85 of 111 ...
Страница 90: ...Natrix IOM Electrical Proximity Switch Revision Date 12 10 2014 Page 90 of 111 ...
Страница 92: ...Natrix IOM Sorter Link Chain Revision Date 12 10 2014 Page 92 of 111 ...
Страница 97: ...Natrix IOM Reading Value Revision Date 12 10 2014 Page 97 of 111 ...
Страница 100: ...Natrix IOM Replace Support Roller Revision Date 12 10 2014 Page 100 of 111 ...
Страница 102: ...Natrix IOM Replace Belt Drive Motor Revision Date 12 10 2014 Page 102 of 111 ...