Natrix IOM
•
After maintenance, REPLACE guards immediately.
•
Keep ALL warning labels clean and clear of any
obstructions.
•
Never remove, deface or paint over WARNING or
CAUTION labels. Any damaged label will be replaced by
TGW Systems at no cost by contacting Lifetime Services.
•
It is very important to instruct personnel in proper
conveyor use including the location and function of all
controls.
•
Special emphasis must be given to emergency stop
procedures.
•
It is important to establish work procedures and access
areas which do not require any part of a person to be
under the conveyor.
•
It should be required that long hair is covered by caps or
hair nets.
•
Loose clothing, long hair and jewelry must be kept away
from moving equipment.
•
Maintain enough clearance on each side of all conveyor
units for safe adjustment and maintenance of all
components.
•
Provide crossovers or gates at sufficient intervals where
needed to eliminate the temptation for personnel to climb
over or under any conveyor.
•
Walking or riding on a moving conveyor must be
prohibited.
•
Before performing maintenance on the conveyor, make
sure the start-up controls are locked out and cannot be
turned on by any person other than the one performing
the maintenance.
•
If more than one crew member is working on the
conveyor, EACH CREW MEMBER MUST HAVE A LOCK
ON THE POWER LOCKOUT.
•
All pneumatic devices must be de-energized and air
removed to prevent accidental cycling of the device while
performing general maintenance.
•
Make sure all personnel are clear of all conveyor
equipment before restarting the system.
WARNING
Revision Date: 12/10/2014
Page
14
of
111
Содержание Natrix
Страница 1: ...INSTALLATION OPERATION MAINTENANCE MANUAL Natrix Shoe Sorter Revision Date February 5 2015 ...
Страница 18: ...Natrix IOM Revision Date 12 10 2014 Page 18 of 111 ...
Страница 19: ...Natrix IOM Symbols and Units Revision Date 12 10 2014 Page 19 of 111 ...
Страница 29: ...Natrix IOM Pictures of packing units or structures continued Revision Date 12 10 2014 Page 29 of 111 ...
Страница 39: ...Natrix IOM Revision Date 12 10 2014 Page 39 of 111 ...
Страница 46: ...Natrix IOM Sorter Link Chain Revision Date 12 10 2014 Page 46 of 111 ...
Страница 48: ...Natrix IOM Blank page for placement Revision Date 12 10 2014 Page 48 of 111 ...
Страница 59: ...Natrix IOM Monitoring of Chain Tension Picture Revision Date 12 10 2014 Page 59 of 111 ...
Страница 60: ...Natrix IOM Replace Sliding Shoe Revision Date 12 10 2014 Page 60 of 111 ...
Страница 62: ...Natrix IOM Blank page for placement Revision Date 12 10 2014 Page 62 of 111 ...
Страница 66: ...Natrix IOM Blank page for placement Revision Date 12 10 2014 Page 66 of 111 ...
Страница 68: ...Natrix IOM Replace Divert Switch Assembly Revision Date 12 10 2014 Page 68 of 111 ...
Страница 72: ...Natrix IOM Adjust Switch Blade Revision Date 12 10 2014 Page 72 of 111 ...
Страница 76: ...Natrix IOM Replace Electrical Components Revision Date 12 10 2014 Page 76 of 111 ...
Страница 85: ...Natrix IOM Charge End Chain Tensioning Unit Revision Date 12 10 2014 Page 85 of 111 ...
Страница 90: ...Natrix IOM Electrical Proximity Switch Revision Date 12 10 2014 Page 90 of 111 ...
Страница 92: ...Natrix IOM Sorter Link Chain Revision Date 12 10 2014 Page 92 of 111 ...
Страница 97: ...Natrix IOM Reading Value Revision Date 12 10 2014 Page 97 of 111 ...
Страница 100: ...Natrix IOM Replace Support Roller Revision Date 12 10 2014 Page 100 of 111 ...
Страница 102: ...Natrix IOM Replace Belt Drive Motor Revision Date 12 10 2014 Page 102 of 111 ...