Store
15
L z
<
Recall
% h
< F <
L z z
<
z z
< W
4
<
³
Problem
In a gravel quarry, two new excavations have been opened. The first one measures 350
metres by 560 metres, the second one measures 340 metres by 610 metres. What
volume of gravel does the company need to extract from each excavation to reach a
depth of 150 metres? To reach 210 metres? Display the results in engineering
notation.
q $ " " < -
350
V
560
L z <
Getting Started
11