Calibration Screen

The data flash configuration can be saved to a file by selecting | File | Export | and entering a file name. A
data flash file also can be retrieved in this way, imported, and written to the bq20z95 using the | Write All |
button.

The configuration information of the bq29z95 and module calibration data also is held in the bq20z95 data
flash.

The bq20z95 allows for an automatic data flash export function, similar to the SBS Data logging function.
This feature, when selected via | Options | Auto Export |, exports Data Flash to a sequential series of files
named as

FilenameNNNNN.gg

where N = a decimal number from 0 to 9.

The AutoExport interval is set under the | Options menu | with a minimum value of 15 s. The AutoExport
filename also is set under the | Options menu |.

When a check mark is next to | AutoExport |, the AutoExport is in progress. The same menu selection is
used to turn on / off AutoExport.

If the data flash screen is blank, then the bq20z95 that is being used may not be supported by the
bqEVSW version that is being used. An upgrade may be required.

Before the bq20z95 is calibrated:

Connect a load to Pack- and Pack+ that draws approximately 2 A and measures discharge current to
use the FETs.

Connect a current source to Batt- and Pack- to calibrate without using the FETs.

Measure the pack voltage from Batt+ to Batt- (Total of Cell voltages).

Measure the temperature of the pack.

These steps may not be required, depending on the type of calibration being performed.

Note that voltage calibration with cells attached requires special consideration. Cells must be in a resting
state. For additional information, go to the TI Web site (

www.ti.com

) and access the TI Knowledge Base

and search for

bq20zxx Calibration Using EV Software

.

Select the types of calibration to be performed (see

Figure 10

).

Enter the measured values for the types selected.

If

Voltage Calibration

is selected, then enter the number of cells on the pack.

If

Temperature Calibration

is selected, then select the sensor that is to be calibrated.

If the load is connected between Pack+ and Pack-, then select the

Use FETs

check box.

Press the

Calibrate Part

button.

This performs the offset calibration for the current offset of the board.

Remove load/external voltage and short Pack- to Batt-.

Press the

CC Board Offset Calibration

button.

This calibrates the voltage at the AFE Pack pin.

Make sure

Voltage Calibration

has been performed for the pack. If

Voltage Calibration

is not performed,

then

Pack Voltage Calibration

calibrates incorrectly.

SLUU275 – October 2006

bq20z95EVM-001 SBS 1.1 Impedance Track™ Technology

13

Enabled Battery Management Solution Evaluation Module

Submit Documentation Feedback

Содержание bq20z95EVM-001

Страница 1: ...ate the overall functionality of the bq20z95 bq29412 solution under different charge and discharge conditions Contents 1 Features 2 2 bq20z95 Based Circuit Module 2 3 bq20z95 Circuit Module Schematic...

Страница 2: ...oard Table 1 Ordering Information EVM PART NUMBER CHEMISTRY CONFIGURATION CAPACITY bq20z95EVM 001 Li ion 2 3 or 4 cell Any The bq20z95 bq29412 based circuit module is a complete and compact example so...

Страница 3: ...When the V BAT is 0 V and CHG FET ON the V PACK is as low as the battery voltage In this case the supply voltage for the device is too low to operate This function has three possible configurations a...

Страница 4: ...the fuse blowing test the actual chemical fuse is not provided in the circuit FET Q4 drives TP3 low if a fuse blow condition occurs so monitoring TP3 can be used to test this condition Fuse placement...

Страница 5: ...and Bill of Materials Figure 2 Top Assembly Figure 3 Top Layer Figure 4 Bottom Layer SLUU275 October 2006 bq20z95EVM 001 SBS 1 1 Impedance Track Technology 5 Enabled Battery Management Solution Evalu...

Страница 6: ...Layouts and Bill of Materials www ti com Figure 5 Bottom Assembly 6 bq20z95EVM 001 SBS 1 1 Impedance Track Technology SLUU275 October 2006 Enabled Battery Management Solution Evaluation Module Submit...

Страница 7: ...Std R13 R32 R34 R38 R39 1 R11 Resistor Chip 0 010 1 W xx 2512 Vishay WSL 2512 010 1 R86 3 R15 R16 R40 Resistor Chip 220 k 1 16 W 5 0603 Std Std 1 R17 Resistor Chip 300 1 W 10 2512 WSL 2512 300 1 R86 2...

Страница 8: ...and Bill of Materials www ti com Figure 6 Schematic This section summarizes the performance specifications of the bq20z95 bq29412 circuit module 8 bq20z95EVM 001 SBS 1 1 Impedance Track Technology SLU...

Страница 9: ...until system prompt new hardware found appears Choose select location manually and use the browse button to point to subdirectory TIUSBWin2K XP 1 4 Answer continue to the warning that drivers are not...

Страница 10: ...est connect PRES pin to PACK pin to set SYS PRES state To test sleep mode disconnect the PRES pin Figure 7 bq20z95 Circuit Module Connection to Cells and System Load Charger The following steps config...

Страница 11: ...ms that are selected for scanning are scanned within this period The bq Evaluation Software provides a logging function which logs the values that were last scanned by EVSW To enable this function sel...

Страница 12: ...ngs are correctly changed to match the pack and application for the bq20z95 solution being evaluated IMPORTANT The correct setting of these options is essential to get the best performance The setting...

Страница 13: ...asures discharge current to use the FETs Connect a current source to Batt and Pack to calibrate without using the FETs Measure the pack voltage from Batt to Batt Total of Cell voltages Measure the tem...

Страница 14: ...applied between Pack and Pack Press the Pack Voltage button to calibrate Figure 10 Calibration Screen 14 bq20z95EVM 001 SBS 1 1 Impedance Track Technology SLUU275 October 2006 Enabled Battery Manageme...

Страница 15: ...Invalid values may cause erroneous results When scaling converted hexadecimal values to a higher number of bytes follow these rules When unsigned is selected the left pad contains zeroes When signed i...

Страница 16: ...eters of your application refer to the data sheet or other application reports For the first evaluation the default values may be used 9 Navigate to the Calibration screen Select the check box for CC...

Страница 17: ...e TI Web site at www ti com Document Literature Number bq20z95 SBS Compliant Gas Gauge Enabled With Impedance SLUS757 Track data sheet bq20z90 110 bq29330 Chipset technical reference manual SLUU264 bq...

Страница 18: ...duct This notice contains important safety information about temperatures and voltages For additional information on TI s environmental and or safety programs please contact the TI application enginee...

Страница 19: ...ce TI is not responsible or liable for any such statements TI products are not authorized for use in safety critical applications such as life support where a failure of the TI product would reasonabl...

Отзывы: