![Tetra Pak COMET RC Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/tetra-pak/comet-rc/comet-rc_manual_1092901043.webp)
CRC804BG
7-2
Tetra Pak
Hoyer
7.1 Cleaning and washing
Before washing the machine, make sure that the
main switch is turned to OFF.
The procedure for washing the production line is as
follows:
a- Prewash with hot water (50ºC).
b- Detergent wash. Use a foaming alkaline
detergent or gel detergent which is a powerful
fat emulsifier in a concentration of 2% to 10%,
depending on how dirty the machine is and on
the hardness of the water supply.
c- Rinse with water. Wait 10 minutes and then rinse
thoroughly to remove the dirt emulsified by the
detergent.
d- Descaling wash. Use an acidic descaler with low
viscosity containing a mixture of wetting agents
and emulsifiers in a concentration of 2% to 3%.
It should remain in contact for at least 15 – 20
minutes.
e- Rinse with water.
f- Disinfectant wash. Use an appropriate
disinfectant diluted in water, in a concentration
of 1 – 1.2%. It should remain in contact for at
least 15 – 20 minutes.
g- Rinse with water.
I
IMPORTANT:
Do not use water under high pressure.
7.2 Regular maintenance
7.2.1 Beginning of the season
•
Wash the machine at the end of production as
described in section 7.1 – Cleaning and
washing, points a, b, c, d and e.
•
dismantle dosers and pipes, wash and disinfect
thoroughly;
material required: water – detergent –
disinfectant
•
Wash machine thoroughly as described in section
7.1 – Cleaning and washing
•
dismantle dosers and pipes, wash and disinfect
thoroughly;
•
check the condition of the seals, and replace if
necessary;
•
lubricate seals;
material required: vaseline oil
•
check that the emergency buttons and
emergency cables are working correctly;
•
inspect the machine and tighten any screws that
may have come loose;
•
check that there is no leakage at connection
points;
•
check the functioning of all moving parts, and
replace if necessary.
7.1.1 Recommended products:
Detergent
Descaler
Disinfectant
SU928 (Diversey Lever)
P3-topax 52 (50/60°) (Henkel Ecolab)
P3-topax 99 (60°) (Henkel Ecolab)
SU616 (Diversey Lever)
P3-topax 17 (60°) (Henkel Ecolab)
7.2.2 Daily
•
lubricate seals, dry components and lubricate
them with neutral vaseline before reassembling
them.
material required: vaseline oil
•
check oil level in lubricator bulb on vibrator or
twister dosers.
Содержание COMET RC
Страница 46: ...HOYER COMET RC CRC804BH 8 1 Tetra Pak Hoyer Contents 8 TROUBLESHOOTING 8 1 Troubleshooting 8 2...
Страница 50: ...CRC804BI 9 3 Tetra Pak Hoyer Fig 9 2 STRUCTURE 1 2 2 2 LIST LAYOUT...
Страница 63: ...CRC910BL 10 5 Tetra Pak Hoyer Fig 10 3 GAUGE 6 7 8 5 4 9 LIST LAYOUT...
Страница 65: ...CRC910BL 10 7 Tetra Pak Hoyer Fig 10 4 SPRAY NOZZLE 4 2 1 3 LIST LAYOUT...
Страница 67: ...CRC910BL 10 9 Tetra Pak Hoyer Fig 10 5 DOSERS 1 2 3 4 5 6 3 7 11 12 13 14 10 9 8 16 18 17 16 18 17 LIST LAYOUT...
Страница 69: ...CRC910BL 10 11 Tetra Pak Hoyer Fig 10 6 TOPPING 11 12 10 9 8 16 15 14 13 6 5 4 3 19 18 2 1 7 7 17 LIST LAYOUT...
Страница 71: ...CRC910BL 10 13 Tetra Pak Hoyer Fig 10 7 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Страница 73: ...CRC910BL 10 15 Tetra Pak Hoyer Fig 10 8 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Страница 75: ...CRC910BL 10 17 Tetra Pak Hoyer Fig 10 9 LID CLOSING 1 2 3 4 5 6 LIST LAYOUT...
Страница 77: ...CRC910BL 10 19 Tetra Pak Hoyer Fig 10 10 EJECTOR 3 2 1 4 5 9 6 LIST LAYOUT...
Страница 79: ...CRC910BL 10 21 Tetra Pak Hoyer Fig 10 11 BYPASS 1 2 4 5 3 2 6 7 9 8 10 3 12 2 3 2 3 11 2 3 11 LIST LAYOUT...
Страница 85: ...CRC910BL 10 27 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 10 5 Fig 10 14 VARIEGATOR LIST LAYOUT...
Страница 87: ...CRC910BL 10 29 Tetra Pak Hoyer 8 5 6 6 7 9 10 3 1 2 13 11 12 4 Fig 10 15 PENCIL FILLER LIST LAYOUT...
Страница 92: ...CRC910BM 11 5 Tetra Pak Hoyer Fig 11 3 CHEWING GUM FEED 3 2 1 5 9 9 10 7 6 4 8 LIST LAYOUT...
Страница 94: ...CRC910BM 11 7 Tetra Pak Hoyer Fig 11 4 DOSERS 1 2 3 4 5 6 3 7 11 12 13 14 10 9 8 16 18 17 16 18 17 LIST LAYOUT...
Страница 96: ...CRC910BM 11 9 Tetra Pak Hoyer Fig 11 5 TOPPING 11 12 10 9 8 16 15 14 13 6 5 4 3 19 18 2 1 7 7 17 LIST LAYOUT...
Страница 98: ...CRC910BM 11 11 Tetra Pak Hoyer Fig 11 6 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Страница 100: ...CRC910BM 11 13 Tetra Pak Hoyer Fig 11 7 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Страница 102: ...CRC910BM 11 15 Tetra Pak Hoyer Fig 11 8 LID CLOSING 1 2 3 LIST LAYOUT...
Страница 104: ...CRC910BM 11 17 Tetra Pak Hoyer Fig 11 8a LID SEALING 1 2 4 6 8 10 3 5 7 9 LIST LAYOUT...
Страница 106: ...CRC910BM 11 19 Tetra Pak Hoyer Fig 11 9 EJECTOR 8 7 5 7 8 4 2 3 1 9 6 11 2 9 6 LIST LAYOUT...
Страница 108: ...CRC910BM 11 21 Tetra Pak Hoyer Fig 11 10 DATE STAMP 1 2 3 4 LIST LAYOUT...
Страница 110: ...CRC910BM 11 23 Tetra Pak Hoyer Fig 11 11 BYPASS 1 2 4 5 3 2 6 7 9 8 10 3 12 2 3 2 3 11 2 3 11 LIST LAYOUT...
Страница 116: ...CRC910BM 11 29 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 11 4 Fig 11 14 VARIEGATOR LIST LAYOUT...
Страница 118: ...CRC910BM 11 31 Tetra Pak Hoyer 8 5 6 6 7 9 10 3 1 2 13 11 12 4 Fig 11 15 PENCIL FILLER LIST LAYOUT...