TESTO 350 M/XL Скачать руководство пользователя страница 35

5.10 Changing the display

· Measurement menu is activated.
1

Open main menu.

2 Select –> .
- Display is shown. The parameter and the unit is shown in every field.
3 Use 

to select field.

4 Open menu with 

.

5 Select 
6 Select parameter and confirm with 

.

7 Select unit and confirm with 

.

- The changed parameter with unit appears in the selected field.

5.11 Setting up printer

1 Assign function button with line feed 

.

2 Tilt the printer cover upward 



.

3 Place paper in the back slot and push it in 



.

4 The paper is drawn by pressing the function button 

. The paper can be

pushed in gently by hand if necessary.

5 Place paper roll in lid.
6 Close instrument lid.
7 Pull paper through the front slot.

LF D

Dr

LF D

Dr

Parameter

View

Device

5. Setting up Control Unit and analyser box measurement system

35









Содержание 350 M/XL

Страница 1: ...Kurzanleitung Erste Schritte de Short manual Getting started en testo 350 M XL und Control Unit...

Страница 2: ...aufmerksam durch und machen Sie sich mit der Bedienung des Produkts vertraut bevor Sie es einsetzen Bewahren Sie dieses Dokument griffbereit auf um bei Bedarf nachschlagen zu k nnen Beachten Sie auch...

Страница 3: ...g Control Unit und Analysebox 10 5 Mess System Control Unit und Analysebox einrichten 12 5 1 Busadresse einstellen 12 5 2 Ger te ausw hlen 12 5 3 Sprache einstellen 12 5 4 Datum Uhrzeit einstellen 12...

Страница 4: ...e Ableitung Schlauch besteht Gefahr f r Material und Benutzer X X 7 EMV Bei erh hter elektromagnetischer Beeintr chtigung kann es zu normkonformen Abweichungen der Messwerte kommen Gefahr bei verbunde...

Страница 5: ...der Abgas Emission Um Ma nahmen zur Abgasreduzierung treffen zu k nnen Bei der Suche der Fehlerursache von erh hten Abgaswerten Kontrollen Zur Informationslieferung um prozesstechnische Ma nahmen ergr...

Страница 6: ...Auffanggef Partikelfilter Kontakte f r Testo Datenbus Gasausgang Auspuff Frischlufteingang LED1 Spannungsversorgung Netzbetrieb gr n dauerhaft Akkubetrieb Akku voll gr n blinkend Akkubetrieb Akku lee...

Страница 7: ...tzteil Tastaturblock Halterung f r Touch Pen Option Funktionstasten Drucker integrierte Differenzdrucksonde Batteriefach Ger ter ckseite PC Schnittstelle RS 232 Betriebsanzeige Folgende Anzeigen sind...

Страница 8: ...der Tasten angezeigt Ein kleiner Pfeil auf der linken oder rechten Seite deutet auf weitere Funktionen die mit bzw erreicht werden k nnen 3 3 5 Eingabedialoge Eingabe von Ziffern und Buchstaben Bei d...

Страница 9: ...n Ladevorgang Analysebox Ladevorgang l uft LED blinkt gr n Ladevorgang beendet LED leuchtet gr n Ein leerer Akku ben tigt bis zur vollst ndigen Ladung ca 3 4 Stunden 4 2 Spannungsversorgung Control Un...

Страница 10: ...legen 2 Die Control Unit gegen die Analysebox dr cken bis sie h rbar einrastet Verbindung der Komponenten mittels Datenbuskabel Datenbuskabel in die Anschlussbuchsen von Control Unit und Analysebox s...

Страница 11: ...nder verbunden sind Akku Pack ist leer Akku laden F hler werden nicht erkannt F hler sind nicht richtig angechlossen F hler richtig anschlie en F hler sind defekt F hler auswechseln 4 4 3 Ausschalten...

Страница 12: ...ion ffnen die Systemkonfiguration mit Control Unit und allen angeschlossenen Komponenten Logger Analysebox Analogausgangsbox Powerbox wird angezeigt 2 Ger t ausw hlen und mit best tigen Die Messwertan...

Страница 13: ...chern der Messwerte X X Drucken der Messwerte X X Zeilenvorschub am Drucker X X Turbulenzgradberechnung bei angeschlossener Turbulenzgradsonde X Starten der Messgaspumpe und Anzeige der Messwerte im D...

Страница 14: ...essortbezeichnung eingeben und mit best tigen 6 Messort ausw hlen und mit best tigen 5 8 Messort ausw hlen Messmen des gew nschten Ger tes ist aktiv 1 Mit Systemkonfiguration ffnen Die Systemkonfigura...

Страница 15: ...die ge nderte Messgr e mit Einheit 5 11 Drucker einrichten 1 Funktionstaste mit Zeilenvorschub belegen 2 Druckdeckel nach oben klappen 3 Papier in den hinteren Schlitz einlegen und hineinschieben 4 D...

Страница 16: ...komplett abgedeckt sind 3 Funktionstaste mit belegen 4 Pumpe starten Durchflussanzeige kleiner 0 1l min Sonde und Gaswege sind dicht Durchflussanzeige gr er 0 1l min Sonde oder Gasweg undicht auf Leck...

Страница 17: ...egen 3 Mit Messung starten Laufende Messung wird in der Startanzeige durch blinkend o angezeigt 4 Durch wird die Messung angehalten Die Werte sind eingefroren Durch Dr cken der Funktionstaste Messwert...

Страница 18: ...det mit einer negativen Triggerflanke Bei pegelabh ngigem Triggersignal l uft die Datenaufzeichnung mit der eingestellten Messrate solange der Triggereingang aktiv ist 2 Startkriterium eingeben 3 Mit...

Страница 19: ...ch das Symbol Nach Abschluss des Messprogramms l uft eine Sp lphase von 2 min Pumpe l uft nach 6 2 3 Erneuter Start des Messprogramms Funktionstaste dr cken Messprogramm startet erneut 6 2 4 Programmi...

Страница 20: ...Notizen 20...

Страница 21: ...Kurzanleitung Erste Schritte de Short manual Getting started en testo 350 M XL and Control Unit...

Страница 22: ...mentation through carefully and familiarise yourself with the operation of the product before putting it to use Keep this document to hand so that you can refer to it when necessary Please refer to th...

Страница 23: ...box 30 5 Setting up Control Unit and analyser box measurement system 32 5 1 Setting up bus address 32 5 2 Selecting instruments 32 5 3 Setting language 32 5 4 Setting date time 32 5 5 Assigning funct...

Страница 24: ...ose is not attached there is a hazard for persons and property X X 7 EMC Exceptionally high amounts of electromagnetic interference can lead to deviations in reading accuracy that no longer conform to...

Страница 25: ...uidelines on flue gas emissions In order to be able to meet measures to reduce flue gas When searching for the cause of increased flue gas values Inspections In order to be able to supply information...

Страница 26: ...ondensate collector Particle filter Contacts for Testo databus Gas outlet exhaust Fresh air inlet LED1 Power Mains operation Green Permanent Battery operation batt full Green Flashing Battery operatio...

Страница 27: ...pad Holder for touchpen option Function keys Printer Built in differential pressure probe Battery compartment rear of instrument PC interface RS 232 Status indicator The following displays are possibl...

Страница 28: ...the keys A small arrow on the left or right side indicates further functions which can be reached by pressing the keys or 3 3 5 Input dialogues Entering numbers and letters When you are requested to e...

Страница 29: ...harging is in progress LED flashes green Recharging is complete LED lights up green An empty rechargeable battery needs up to approx 3 4 hours for complete recharging 4 2 Power supply to Control Unit...

Страница 30: ...box 1 Place Control Unit on the contact strips of the analyser box 2 Press Control Unit to analyser box until they click into place Connecting the components using the databus cable Insert data bus ca...

Страница 31: ...echargeable battery pack is empty Recharge battery Probes are not recognised Probes are not connected correctly Connect probes correctly Probes are defective Exchange probes 4 4 3 Switching off Switch...

Страница 32: ...iguration with The system configuration with the Control Unit and all connected components logger analyser box analog output box powerbox is shown 2 Select instrument and confirm with The reading disp...

Страница 33: ...ion X Save readings X X Print readings X X Printer line feed X X Turbulence calculation with connected turbulence probe X Starts the measuring gas pump and indicates the readings on the display When X...

Страница 34: ...etting mode with 4 Select new location 5 Enter location name and confirm with 6 Select location and confirm with 5 8 Selecting location Measurement menu of required instrument is activated 1 Open syst...

Страница 35: ...eter with unit appears in the selected field 5 11 Setting up printer 1 Assign function button with line feed 2 Tilt the printer cover upward 3 Place paper in the back slot and push it in 4 The paper i...

Страница 36: ...ap on probe tip such that the countersinks are completely covered 3 Assign to function key 4 Start pump Flow display less than 0 1l min probe and gas paths are leak proof Flow display less than 0 1l m...

Страница 37: ...ction key 3 Start measurement by pressing A measurement which is in progress is indicated by a flashing o 4 The measurement is halted by activating The values are frozen Print readings by pressing the...

Страница 38: ...is started and stopped with a rising edge The measuring program is started and stopped with a falling edge With level dependent trigger signals the data recording proceeds at the adjusted measuring ra...

Страница 39: ...gram remains activated indicated by the symbol Generally there is a rinsing phase of 2 minutes after the measuring program is finished pump slow 6 2 3 Restarting measuring program Press function key M...

Страница 40: ...testo AG Postfach 11 40 79849 Lenzkirch Testo Stra e 1 79853 Lenzkirch Telefon 07653 681 0 Fax 07653 681 100 E Mail info testo de Internet http www testo com 0973 3504 01 T dr 31 08 2004...

Отзывы: