5 First steps
20
5 First
steps
5.1. Commissioning
The measuring instrument is supplied with a rechargeable battery
already fitted.
> Charge the rechargeable battery fully before using the
measuring instrument, see
Charging the battery, page
43
.
5.2.
Getting to know the product
5.2.1. Mains
operation
If the mains unit is connected, the measuring instrument is
automatically powered from the unit.
1.
Connect the mains unit instrument plug to the instrument's
micro USB socket.
2.
Connect the mains plug of the mains unit to a mains socket.
In mains operation the battery is automatically charged.
5.2.2. Connecting
probes
Probe detection at the flue gas socket is carried out
continuously. New probes are recognised automatically.
Connecting flue gas probes/gas pressure
adapters/temperature adapters
> Insert the connector plug into the flue gas socket and lock by
slightly turning it clockwise (bayonet lock).
There must be no more than one extension lead
(0554 1201) between measuring instrument and flue gas
probe.
Содержание 320 basic
Страница 1: ...testo 320 basic Flue gas analyzer Instruction manual...
Страница 53: ......
Страница 54: ...0970 3201 en 05 V01 00 en...