Operation manual Pneumator
∙
Testo Industrial Services
∙
Version 1.4
∙
2019
∙
Page 12
Submenu „Steps down“:
Define requested number of
descending pressure steps (buttons UP, DOWN, 0%, 100%,
confirm with OK).
Submenu „Configuration 1“:
By pressing OK, a further menu
overview is being opened. The meaning of the variables is also
clarified in the following illustration.
Submenu „Cycles“:
Here is being defined how often the
pressure sequence shall be repeated (buttons UP,
DOWN, 0%, 100%, confirm with OK).
Submenu „T Start“:
Initial waiting time for the venting
(buttons UP, DOWN, 0%, 100%, confirm withOK),
compare illustration and chart
Submenu „T Stop“:
Waiting time at maximum pressure
(buttons UP, DOWN, 0%, 100%, confirm with OK),
compare illustration and chart
Submenu „T Hold“:
Holding time of each adjusted
pressure stage (buttons UP, DOWN, 0%, 100%, confirm
with OK), compare illustration and chart
Submenu „T Pause“:
Pause time between 2 cycles
(buttons UP, DOWN, 0%, 100%, confirm with OK),
compare illustration and chart
Submenu „Auto Zero“:
Selection (buttons UP / DOWN,
confirm with OK), whether an automatically zero-ing shall
be driven as phase 4. ON = yes, OFF = no.
o
Leave the menu by pressing the MENU button several times