![TESTING DT-202 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/testing/dt-202/dt-202_operation-manual_1092053005.webp)
iii
Cautions on operation
1.
Check if screws of each part are securely fastened or the tester is free of abnormal symptoms before starting a
test.
2.
Check if the tester base is kept free of obstacles.
3.
Don’t test any specimen exceeding the specified range (maximum dimensions and maximum weight).
4.
Never apply any external force to the pneumatic cylinders which fix the specimen, otherwise the pneumatic
cylinders may become defective.
5.
A specimen is released by drop operation to drop freely. Don’t approach to the tester base interior.
6.
A specimen may tilt down in an unexpected direction due to drop collision. Particularly be careful since certain
specimens may be broken to scatter.
7.
If the cover is removed from the control unit, etc. due to unavoidable circumstances, turn off the power source
to prevent an electric shock accident.
8.
Turn off the power source before checking the tester.
9.
The power supply is 220VAC, single-phase (with a grounding terminal). Connect the equipment to the ground
without fail.
10.
If it is necessary to stop running the equipment urgently due to unavoidable circumstances, turn off the
[POWER] switch.
11.
If the equipment is not used for a long time, disconnect the power cord plug from the plug socket.
Содержание DT-202
Страница 1: ...DT 202_007 Operation Manual for Drop Tester Model DT 202 SHINYEI TESTING MACHINERY CO LTD...
Страница 2: ......
Страница 8: ......
Страница 10: ...2 Outer View 2 2 Outer View Fig 1...
Страница 16: ...5 Operation method 8 Fig 6 Control unit...
Страница 22: ...9 Diagram 14 9 Diagram 9 1 Wiring diagram...
Страница 24: ...9 Diagram 16 9 3 Pneumatic piping diagram...