Chapter 2 – Installation
TestEquity 1016C-1027C Temperature Chamber
Page 2-1
Chapter 2 – Installation
Uncrating
Inspect the shipping container for any signs of visible damage. Notify the carrier and TestEquity
immediately if there are signs of shipping damage.
The pallet is designed with ramps so the chamber can be rolled off without the need for a forklift
or pallet jack.
Preparation For Use
1.
Inspect the chamber for signs of shipping damage.
2.
Read this entire manual.
3.
Select a suitable location to install the chamber.
4.
Verify the input voltage configuration.
5.
Connect to the power source.
6.
Perform following the procedures as described in the Preventive Maintenance section:
a. Inspect the electrical compartment.
b. Inspect the refrigeration machinery compartment.
c. Check the low-stage refrigeration charge.
e. Verify the chamber performance.
Installation Location
The chamber will produce a significant amount of heat during normal operation. Locate the
chamber in a room with adequate ventilation to prevent excessive heat build-up. Allow enough
space around the chamber to permit serviceability and the removal of the service access panels,
which are located on each side and the rear.
The chamber must be on a solid and level floor.
!
CAUTION:
The minimum clearance you should allow for proper ventilation around the
chamber must be at least 12" from both the left and right side, and 24" from
the rear.
!
CAUTION:
This chamber is designed for operation in a conditioned laboratory
environment. Operation above 30°C (85°F) or below 16°C (60°F) ambient
room temperature is NOT recommended.