Chapter 2 – Installation
TestEquity 1007H Temperature Chamber
Page 2-1
Chapter 2 – Installation
Uncrating
Inspect the shipping container for any signs of visible damage. Notify the carrier and TestEquity
immediately if there are signs of shipping damage.
The pallet is designed with ramps so the chamber can be rolled off without the need for a forklift
or pallet jack.
1.
Cut the two metal bands that hold the packaging to the pallet.
2.
Remove the top cover.
3.
Remove the plastic fasteners that hold the outer box together and remove the outer box.
4.
Locate the retainer in the front of the pallet. Remove the two screws, then remove the
retainer. Keep in mind that there is also Velcro that holds the retainer in place. Place the
retainer in the front of the pallet on the floor.
5.
Locate the two ramps under the chamber and remove them.
6.
Attach the ramps to the front of the pallet using the Velcro straps. The retainer will be under
the ramps and act as a support.
7.
Carefully roll the chamber off the pallet, onto the ramps. This should be done with at least
two people.
Preparation For Use
1.
Inspect the chamber for signs of shipping damage.
2.
Read this entire manual.
3.
Select a suitable location to install the chamber.
4.
Verify the input voltage and phase configuration.
5.
Connect to the power source.
6.
Perform following the procedures as described in the Preventive Maintenance section:
a. Inspect the electrical compartment.
b. Inspect the refrigeration machinery compartment.
c. Check the low-stage refrigeration charge.
d. Check the high-stage refrigeration charge.
e. Verify the chamber performance.