3.4
ASSEMBLING OPERATIONS
Mount the tyres in the suitable holes.
3.5
TRANSPORT ON TRAILER
Machine is not suitable for road towing.
Possible displacements on trailer in the working site must be carried out by a connection to the towing
unit by means of the towing eye on the drawbar (table 1, pos. 6) and in the respect of the speed limits
of the axle. The used towing unit must be homologated for towing trailers with mass and dimensions
as per the described machine.
Before transporting operation, lift the rear stabiliser (table 1, pos. 11) and the front plough
(table 1, pos. 5) acting on the lever (table 3, pos. 29) (NOTE: during this operation the diesel engine
has to be always started-up).
Check the inflation pressure of tyres (5 bars).
During trailer machine transport operations is nobody must stay in the machine itself.
ATTENTION:
dangerous situations during towing if the tyres inflation pressure and the speed
limit are not respected may happen.
When transporting on truck or trailer, verify if the machine has been fixed on the platform with nailed
wedges and/or metal brackets and/or tie rods.
3.6
POSITIONING AND ANCHORING
Positioning and anchoring of the machine have to be carried out only by trained personnel, verifying if
the ground grants the foreseen stability, support and anchoring.
The machine has to be placed in a distance from the first pylon or trestle for the rope passage (or
conductor) included between 2 and 4 times the height h of the pylon itself (see diagram here below).
It is possible to use the machine at a distance from the pole included between 1 and 2 times the height
of the pole itself. In this case, the anchorage described thereafter must be over dimensioned of 125%
compared to the reported data and some moorings must be provided on the front side of the machine.
PROHIBITION: when the distance between the machine and the pole is lower than the
height of the pole itself, the machine use is not possible.
Содержание AFS303
Страница 36: ......
Страница 39: ......
Страница 41: ......
Страница 43: ......
Страница 45: ......
Страница 47: ......
Страница 57: ...PRESETTINGS EQUIPMENT AFS 303 300 25 03 2011 Facoetti Ing Oscar...
Страница 58: ...0 1 2...
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ...JP1...
Страница 63: ...JP2...
Страница 64: ...LD1 LD2 LD3 LD4...
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......