![Tesla SOLARGLASS Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/tesla/solarglass/solarglass_installation-manual_1091545019.webp)
19
1551592-00-B
Mark layout of electrical components by snapping chalklines where tile courses, Diode Trunk
Harnesses, and the Pass Through Box will be located.
1.
Verify transition location on plan set (must be within 5’ max conductor length from RSD unit).
2.
Install Pass Through Box using wiring methods and materials that comply with Article 690 and
Chapter 3 of the NEC and local regulations.
PASS THROUGH BOX