18
Powerwall Stack Kit Installation Manual
•
Connect the communication OUT connector of the first Powerwall to the
communication IN connector of the second Powerwall.
•
Insert the shield/drain wire in the second Powerwall chassis ground lug (Fig 24). The
ground lug is identified with the following symbol:
. Tighten the screw in the ground
lug to 4.5 Nm (40 lb-in).
Figure 24: Connecting Powerwall Communication Ports
•
In the last Powerwall in the communication chain, plug the 4-pin Phoenix connector
with the terminating 120-Ohm resistor into the top 4-pin socket (labeled “OUT”).
Figure 25: Connector with Terminating Resistor
Figure 26: Powerwall Communication Termination
Содержание Powerwall 2
Страница 1: ...Powerwall 2 Stack Kit Installation Manual...