12
WARNING :
-
CHECK BOTH OF THE BATTERY GROUPS FOR CORRECT POLARITY AND VOLTAGE
-
DO NOT TURN ON THE BATTERY SWITCH (F5) BEFORE STARTING THE UPS
5. Connect the copper earth bus, to the safety earth of the mains distribution panel.
NOTE :
The earth and the neutral connections must be in accordance with the local rules.
WARNING: Note that the Input Neutral (N1) MUST also be connected to K10 terminal
2.6.1 Description of connection terminals of the UPS :
•
As shown on the power connection label of the UPS, U1, V1 and W1 phase of the incoming 3 phase
supply are used as the bypass inputs under normal conditions.
Ş
ekil 2.2
10-15-20-30 kVA Cable Connection
Содержание DS300SHA Series
Страница 1: ...DS300SHA SERIES DSP Controlled UPS Pf 0 8 10 15 20 30 kVA 3 Phase IN 3 Phase OUT USER MANUAL ...
Страница 2: ......
Страница 17: ...14 Figure 2 3 External Battery Connections 60x12V 30x12V Batteries 30x12V Batteries ...
Страница 18: ...15 Figure 2 3a DS300SHA Series 10 15 20 30 KVA Internal Battery Connections 60x12V 5Ah ...
Страница 19: ...16 Figure 2 3a DS300SHA Series 10 15 20 30 KVA Internal Battery Connections 60x12V 7 9Ah ...
Страница 56: ......
Страница 57: ...AGKK12611 10 2021 ...