background image

 

  

 

30

 
 

 

INV L1-L2-L3 phase status codes 

178 

Inverter stopped but on inverter L1 phase output still DC voltage sensed 

278 

Inverter stopped but on inverter L2 phase output still DC voltage sensed 

378 

Inverter stopped but on inverter L3 phase output still DC voltage sensed 

179 

During inverter run at last 25 milliseconds the L1 phase output alternance is not changed 

279 

During inverter run at last 25 milliseconds the L2 phase output alternance is not changed 

379 

During inverter run at last 25 milliseconds the L3 phase output alternance is not changed 

180 

At  the  end  of  4  times  retry  During  soft  start  after  4  seconds  still  the  L1  phase  output  voltage  is 
less then 30 volts AC 

280 

At  the  end  of  4  times  retry  During  soft  start  after  4  seconds  still  the  L2  phase  output  voltage  is 
less then 30 volts AC 

380 

At  the  end  of  4  times  retry  During  soft  start  after  4  seconds  still  the  L3  phase  output  voltage  is 
less then 30 volts AC 

181 

At the end of 4 times retry During soft start at the end of 4 seconds L1 output  voltage is bigger 
then (output high/2) value 

281 

At the end of 4 times retry During soft start at the end of 4 seconds L2 output  voltage is bigger 
then (output high/2) value 

381 

At the end of 4 times retry During soft start at the end of 4 seconds L3 output  voltage is bigger 
then (output high/2) value 

182 

During  power  on  L1  phase  bypass  SCR  must  be  off  but  at  the  L1  phase  output  there  is  AC 
voltage 

282 

During  power  on  L2  phase  bypass  SCR  must  be  off  but  at  the  L2  phase  output  there  is  AC 
voltage 

382 

During  power  on  L3  phase  bypass  SCR  must  be  off  but  at  the  L3  phase  output  there  is  AC 
voltage 

183 

L1 phase by-pass SCR must be on but there is only positive alternance at the UPS output 

283 

L2 phase by-pass SCR must be on but there is only positive alternance at the UPS output 

383 

L3 phase by-pass SCR must be on but there is only positive alternance at the UPS output 

184 

L1 phase by-pass SCR must be on but there is only negative alternance at the UPS output 

284 

L2 phase by-pass SCR must be on but there is only negative alternance at the UPS output 

384 

L3 phase by-pass SCR must be on but there is only negative alternance at the UPS output 

185 

L1 phase by-pass SCR must be on but there is no output voltage at the UPS output 

285 

L2 phase by-pass SCR must be on but there is no output voltage at the UPS output 

385 

L3 phase by-pass SCR must be on but there is no output voltage at the UPS output 

186 

Output CB is energized but at the L1 phase output there is only positive alternance 

286 

Output CB is energized but at the L2 phase output there is only positive alternance 

386 

Output CB is energized but at the L3 phase output there is only positive alternance 

187 

Output CB is energized but at the L1 phase output there is only negative alternance 

287 

Output CB is energized but at the L2 phase output there is only negative alternance 

387 

Output CB is energized but at the L3 phase output there is only negative alternance 

188 

Output CB is energized but at the L1 phase output there is no AC voltage 

288 

Output CB is energized but at the L2 phase output there is no AC voltage 

388 

Output CB is energized but at the L3 phase output there is no AC voltage 

189 

During load on by-pass on the L1 output short circuit sensed 

289 

During load on by-pass on the L2 output short circuit sensed 

389 

During load on by-pass on the L3 output short circuit sensed 

190 

On L1 phase output reverse current sensed 

290 

On L2 phase output reverse current sensed 

390 

On L3 phase output reverse current sensed 

191 

During load on inverter ,on L1 phase by-pass line leakage current sensed 

291 

During load on inverter ,on L2 phase by-pass line leakage current sensed 

391 

During load on inverter ,on L3 phase by-pass line leakage current sensed 

 

 
 
 
 
 

Содержание DS300 Series

Страница 1: ...DS300 SERIES DSP Controlled UPS 100 120 160 kVA 3 Phase In 3 Phase Out USER MANUAL...

Страница 2: ......

Страница 3: ...Cables 10 2 5 Safety Earth 10 2 6 Cable Connection Procedure 10 2 6 1 UPS Power Cable Connection Terminals 11 2 7 Battery Installation 12 III FRONT PANEL 14 3 1 Introduction 14 3 2 Front Panel Menu D...

Страница 4: ...5 4 Annual Maintenance 44 5 5 Storage conditions and transportation of ups 44 VI FAULTS AND TROUBLESHOOTING 45 6 1 General Procedure for fault checking and troubleshooting 45 6 2 Before calling servic...

Страница 5: ...C power is disconnected To reduce the risk of electric shock disconnect the UPS from the mains supply before installing a computer interface signal cable Reconnect the power cables only after signalin...

Страница 6: ...ternal voltage and frequency regulating software which ensures that its output to the critical load is maintained within close tolerances independent of voltage and frequency variations on the mains p...

Страница 7: ...ble polarity battery with common terminal Automatic and manual battery test and battery temperature compensation features 3 separate maintenance clock counters Battery charge with current limiting Aut...

Страница 8: ...Switch S4 F7 F8 F9 Output Switch Fuse S5 F10 F11 F12 Battery Switch Fuse K1 Rectifier Input Contactor K2 Inverter Output Contactor Rectifier Charger 3 PHASE MAINS I P Battery Dual Polarity Maintenanc...

Страница 9: ...lack outs when it is connected to either static or maintenance bypass supply 1 2 2 OPERATING CONDITIONS OF UPS UPS may be in one of the following operating conditions A Normal Operation If Mains suppl...

Страница 10: ...Communation Socket DB9 female Relay Output contacts Batt circuit breaker output and input Generator input Temperature sensor Relay 2 S7 On off switch S1 AC input F1 F2 F3 S3 Maintenance by pass S4 AC...

Страница 11: ...ration mode Efficiency 100 Load up to 94 Load Crest Factor 3 1 Output Voltage THD linear load 2 Overload 125 Load 10min 150 Load 1min BATTERY Total Number 60 blocks 12V 2x30 serial 60 batteries extern...

Страница 12: ...is noted call the shipper immediately and retain the shipping carton and the UPS 2 Carefully open the carton and take the UPS out 3 Retain the carton and packing material for future use Unit package...

Страница 13: ...ductor should be sized for 1 5 times the output bypass phase current These recommendations are for guideline purposes only and are superceded by local regulations and codes of practice 2 5 Safety Eart...

Страница 14: ...Connect the copper earth bus to the safety earth of the mains distribution panel NOTE The earth and the neutral connections must be in accordance with the local rules WARNING Note that the Input Neut...

Страница 15: ...ment at reasonable temperatures to obtain efficient battery operation In general a minimum space of 10 mm must be left on all vertical sides of the battery block A minimum clearance of 20 mm should be...

Страница 16: ...13 30x12V Batteries 30x12V Batteries 0 360V 360V 0 K1 K2 K3 K2 Figure 2 3 External Battery Connections 60x12V...

Страница 17: ...2 Load on bypass indicator lamp L3 Input voltage indicator lamp L4 Rectifier run pilot lamp L5 Battery operation indicator lamp L6 Load on UPS indicator lamp L7 Output switch on indicator lamp There a...

Страница 18: ...l measurements ENTER EXIT ALARM LOGS UPS LOG RECORD Page1 ENTER CLEAR LOG Page1 ENTER EXIT INFORMATION RS232 Comm 1 2 Page1 Maximum UPS power Page1 Nominal voltage and frequency Page1 Inverter firmwar...

Страница 19: ...ut command Page3 ENTER EXIT PASSWORD Getting service code Page1 Type service password Page1 Type user password Page1 ENTER EXIT ADJUST in English Group adjustments Automatic settings Inverter factory...

Страница 20: ...alarm messages Up previous page down next page MEASUREMENTS INPUT Page 3 Level 3 ENTER EXIT ENTER exit to upper menu Current alarm messages Up previous page down next page MEASUREMENTS BYPASS Level 2...

Страница 21: ...1 222 223 V Phase to neutral measured AC UPS output voltages Iout 00 0 00 0 00 0 A Measured AC RMS load currents Current alarm messages Up previous page down next page MEASUREMENTS OUTPUT Page 2 Level...

Страница 22: ...n next page MEASUREMENTS DC Page 3 Level 3 Backup time 0000 min Calculated remaining time Current alarm messages Up previous page down next page MEASUREMENTS DC Page 4 Level 3 ENTER EXIT ENTER exit to...

Страница 23: ...32 activity indicator for com1 and com2 MAX Power 60000 VA Maximum ups output power as VA Nom 220 050 220 050 Nominal input output voltage and frequency Current alarm messages Up previous page down ne...

Страница 24: ...adjust BL DELAY CLOSED Backlight delay BL DIM CLOSED Back light half option selection Current alarm messages Up upper line down next line or options ENTER select an option OPTIONS LCD OPTIONS Page 3 L...

Страница 25: ...PTIONS COMMUNICATION OPTIONS Page 4 Level 3 RELAY 7 Left and right buton relay function selection option RELAY 8 Left and right buton relay function selection option RELAY 9 Left and right buton relay...

Страница 26: ...PTIONS Page 3 Level 3 ENTER EXIT ENTER exit to upper menu Current alarm messages Up previous page down next page Level 3 Bypass options VAT transfer ON OFF Page1 Gen set bypass ON OFF Page1 Gen set sy...

Страница 27: ...ND ON OFF Left and right disable alarm buzzer MIMIC LED TEST ENTER lamp test Current alarm messages Up upper line down next line or options ENTER apply command COMMAND MENU Page 4 Level 2 ENTER EXIT E...

Страница 28: ...on recorded maximum power ENTER FAULT RESET ENTER fault reset Current alarm messages Up upper line down next line SERV CE MENU Page 2 Level 2 FAN MAINT 01000 Remaining hours to FAN maintenance BAT MAI...

Страница 29: ...0 or R00 Alarm is shown on the LCD panel we understand that there is a system fault at the related module We saw the message in the A00 INV FAULT XXXX or R00 PFC FAULT XXXX format Numbers shown in X d...

Страница 30: ...ertemperature at inverter power module A03 BATT HIGH Alarm Inverter module measured battery voltage high A04 OUTPUT V LOW Alarm Inverter output voltage is low A05 OUTPUT V HIGH Alarm Inverter output v...

Страница 31: ...rd power supply out of tolerant A40 INVERTER START Warning Inverter is in soft start stage wait for finish A43 USER LOGIN Warning User logged in to UPS A45 SERV PASSWORD Fault For UPS startup service...

Страница 32: ...time 369 Overcurrent occured on L3 phase longer then allowed time 170 On L1 phase momentary short circuit conditions occured but now inverter is running 270 On L2 phase momentary short circuit conditi...

Страница 33: ...ce at the UPS output 383 L3 phase by pass SCR must be on but there is only positive alternance at the UPS output 184 L1 phase by pass SCR must be on but there is only negative alternance at the UPS ou...

Страница 34: ...t at the UPS output there is no 3 phase AC voltage INV Control activity status codes 612 INV Over RS232 interface battery quantity updated 613 INV Over CAN1 interface battery quantity updated 614 INV...

Страница 35: ...eived 651 INV Over CAN1 interface generator mode start command received 652 INV Over RS232 interface start sleep mode command received 653 INV Over CAN1 interface start sleep mode command received 654...

Страница 36: ...ge is higher then R2131 adjustment 1401 PFC DC bus voltage is higher the R2131 adjustment 1402 PFC DC LEM current sensor error 1403 PFC module DC BUS voltage high alarm repeated 4 times within R2166 t...

Страница 37: ...received 1643 PFC over CAN1 interface cancel battery test command received 1644 PFC over RS232 interface start boost charge mode command received 1645 PFC over CAN1 interface start boost charge mode...

Страница 38: ...frequency is normal R06 OVERTEMPERATURE Overtemperature at rectifier module call service R07 BLACKOUT There is a short blackout at the AC input voltage of the UPS this is temporary wait until the AC...

Страница 39: ...perature if hot use air cooling system 100 120 and 160 kVA DS 300 series UPS don t have internal batteries L02 TH2 TEMP HIGH L04 TH2 TEMP LOW UPS TH2 cabinet inside temperature is out of tolerance che...

Страница 40: ...nt is normal A07 SHORT CIRCUIT There is short circuit at the output of the UPS check installation and loads A08 ON MAINTENANCE The maintenance by pas switch of the UPS is ON 1 position there is a lock...

Страница 41: ...ds the mesage will be cleared A26 BATTERY LOW The DC BUS or battery voltage of the UPS is low still UPS is running but DC voltage is going down If this alarm occures during mains failure it means that...

Страница 42: ...very high higher then 150 the UPS limited the output current This status is temporary but if continues call service A38 FUSE FAILURE Call service A39 PSP FAILURE Call service A43 USER LOGIN User logg...

Страница 43: ...TTENTION BYPASS VOLTAGE WILL BE CONNECTED TO THE OUTPUT TERMINALS OF UPS WHEN THE ON OFF SWITCH S7 IS SWITCHED ON 4 Turn on S7 On Off switch to 1 position LCD panel activates and INV RESET or PFC RESE...

Страница 44: ...n this case bypass voltage is connected directly to the output of UPS and the critical load is supplied via maintenance bypass switch No AC or DC supply is connected to the inside and the circuits of...

Страница 45: ...the Ah capacity charge status age of the batteries actual load percentage of UPS and the ambient temperature Otherwise critical loads will be out of power at the end of battery autonomy time A26 BATT...

Страница 46: ...NCE counter BATTERY MAINTENANCE counter GENERAL MAINTENANCE counter This type of protective maintenance prevents small problems turning up to big failures DS300 Series UPS has been designed to require...

Страница 47: ...one at least two times a year in order to provide safe and efficient operation your UPS and battery group UPS generates a warning message when the maintenance time has expired 5 5 Storage Conditions a...

Страница 48: ...ed while trying to indicate the error Fault determination First step is to record the messages indicator panel LEDs operating parameter values and last status of switches This must be done before Fixi...

Страница 49: ...RY TEST until battery low alarm CANCEL battery test Turn off UPS output voltage immediately SHUTDOWN Turn off UPS output voltage after delay WAITING SHUTDOWN Turn off UPS output voltage SHUTDOWN and t...

Страница 50: ...phone and listen the modem sound NOTE Not all the modems are compatible with the command set on UPS In such a case modem should be set by connecting a PC 7 3 2 Functioning Principle The remote operato...

Страница 51: ...emperature sensor input 11 12 Function programmable relay contact output 2 13 14 Function programmable relay contact output 3 15 16 Function programmable relay contact output 4 ATTENTION Maximum 42Vac...

Страница 52: ...fits economically as well as supporting to create a cleaner environment and protecting our world sources 2 Every electric powered device is designed appropriate to a defined power level Device capacit...

Страница 53: ......

Страница 54: ...AGKK10632 09 2021...

Отзывы: