TESA-hite 400 / 700
Detailed procedure for detecting the culmination point
Probe/Contact
Display
Active keys
Comments
• Place the gauge head slightly off-
Centre with respect to the shaft axis.
•
Wait
about
1
second.
Beep Beep
• Move the part or the TESA-Hite.
Second contact.
Culmination point detected.
The
bar
graph
indicates
the
current
measuring
force.
mm
End of shaft
measurement.
Display
centre
of diameter.
mm
Call up diameter
display.
Force diameter mode
Cancel diameter mode
mm
Forced display of diameter
Displays
centre
Quit
diameter
display
priority.
mm
Wait 1 second
Measure depth
in probing zone
of groove.
Beep
Probing mode 1 (St1)
mm
26
Содержание TESA-hite 400
Страница 1: ...TESA hite 400 700 Instruction manual TESA hite 400 700 ...
Страница 2: ...TESA hite 400 700 2 ...
Страница 30: ...TESA hite 400 700 2 x mm 2 1 x 5 x mm 3 1 x mm 4 2 x 1 x mm 5 1 x 1 x mm 6 4 x 1 x mm 7 5 x 1 x mm 8 30 ...
Страница 32: ...TESA hite 400 700 mm mm mm PRESET function Mode 3 Access and entry of PRESET As for Modes 1 and 2 32 ...
Страница 52: ...TESA hite 400 700 52 NOTES ...