background image

3

www.termoakim.com

DEVICE INSTALLATION

• 

Do not install the device

 in area which are damply like bath-

room and the area that exposed from rain, snow, water etc.

• 

The device should be mounted on solid walls that can 

support itself with the dowel, screw and hanger bracket 

supplied with the device.

• 

In order for the authorized service to intervene in the 

event of a technical malfunction or maintenance, a spa-

ce should be left around the device in the dimensions 

specified below.

•  If the device is not installed in accordance with the standards 

specified in the user manual, and the gaps indicated in the pic-

ture below are not left around the device, the authorized service 

charges a fee regardless of the warranty status.

WARNING:

It is the customer’s responsibility to assemble the device in 

accordance with the standards specified in the user manual.

20 CM

20 CM

50

 C

M

Minimum clearance values to be left around the device.

Содержание GALAXI PRO Series

Страница 1: ...GALAXI PRO SERIES ELECTRIC COMBI BOILER User Manual and Warranty Certificate Certificate No AQ TR 2165 TS EN ISO 9001 2000 ...

Страница 2: ...boilerandfloorheatingveryclosely Weaimtomakeourcustomersbenefitfromthelatesttechnologybyapplyingtechnologi caldevelopmentstoourproducts Warmingandproducinghotwaterwillnolongerbeaproblem wewillcontinuetopro ducethebestproductsforyou Thankyouforchoosingus Hopetouseyourproductongooddays BestRegards Always read the operating instructions before using the product heating systems ...

Страница 3: ...n Of The Device 6 Electrical Connection Of The Device 7 Flooding The Device 9 Initial Operation Of The Device 10 Using The Control Panel Of The Device 11 Device Error Information 13 Electrical Connection Diagram And Panel Output Information 14 Safety Precautions Of The Device 15 Periodic Maintenance Of The Device 15 Rules That Must Be Followed 16 CONTENTS ...

Страница 4: ...Probe 4 Resistances 5 Expansion Tank 6 Boiler Body 7 Air Purger 8 Reset Safety Thermostat 9 Mains Input Terminal 10 Power Distribution Board 11 Automatic Air Release 12 Recirculation Pump 13 Fill Valve 14 3 Bar Safety Valve PARTS OF ELECTRIC COMBI BOILER Cold Water Inlet 1 2 Heater Return 3 4 Heater Outgoing 3 4 ...

Страница 5: ... a technical malfunction or maintenance a spa ce should be left around the device in the dimensions specified below If the device is not installed in accordance with the standards specified in the user manual and the gaps indicated in the pic ture below are not left around the device the authorized service charges a fee regardless of the warranty status WARNING It is the customer s responsibility ...

Страница 6: ...COVER In order to open the cover as seen in the picture below the bolts at the bottom of the device are unscrewed the lower part of the cover is pulled towards us and push up the cover is removed from its place Coveropeningshapeanddirection ...

Страница 7: ... stalled The installation connection of the device should be made in such a way that its valves dirt holders and records are complete as shown in Fig 1 The drain outlet under the device should be connected to any outlet because it will automatically open and drain itself out in 3 bars when too much water is pressed Fig 2 WARNING It is the customer s responsibility to complete the installation of t...

Страница 8: ... the three way valve cable and heat sensor are not supplied with the device If the device is to be used in boiler mode the boiler mode must be turned on from the parameters of the device To enter the parameter and keys on the device are pressed at the same time P0 0 image appears on the screen After this image is displayed the value from 0 is set to 1 by pressing the button The device has switched...

Страница 9: ... be pulled into the device must comply with TSE Turkish Standards Institute norms Electrical connections of the device should only be made by au thorized electricians The cable to be drawn to the device must be pulled from the main network panel The cable to be pulled must be in one piece with no attachment The cable section to be cut into the device the leakage current relay ampere and the ground...

Страница 10: ...S and T phases 3 phas es are bridged together Neutral and ground line are con nected Is shown in the figure Triphase Connection Input to R S T phase ends at the input terminal Neutral and ground line are connected Is shown in the figure R S T N Neutral Phase Empty Ground R S T N Neutral T phase 3 S phase 2 R phase 1 Empty Ground ...

Страница 11: ...intake valve the air intake valve is closed The pressure is brought to 1 5 bar and the water pressing process is completed When the water pressure of the device falls below 1 bar it causes a low pressure error ER2 In this case the filling valve is opened and the pressure is brought to 1 5 bar If this situation is constantly happening there is a possibility of leakage in the installation This may a...

Страница 12: ...horized electricians Ensure that the voltage supplied to the device is appropriate low or not high The radiator temperature and external hot water tank temperature should be set to 40 C during the first operation of the device When it is operated for a while and made sure there is no air in it the consumer can adjust the temperature he wants The device must be activated by our technical services i...

Страница 13: ...com USING THE CONTROL PANEL OF THE DEVICE ON OFF BUTTON SET BUTTON BOILER MODE BUTTON DEVICE DEGREE HEATING MODE BUTTON HEATING MODE ON DECREASE BUTTON CIRCULATION PUMP ON BOILER MODE ON INCREASE BUTTON LEVEL INDICATORS ...

Страница 14: ...on In this way it is understood which mode the device is in Setting The Set Temperature Of The Device Radiator temperature adjustment Press the degree setting button on the panel once C tempera ture setting will appear And the led light above the symbol will start to flash You can adjust the degree with the keys Boiler temperature settings Press the degree setting button on the panel 2 times You w...

Страница 15: ...lls below 0 8 bar it gives a low pressure error and protects itself by closing Solution You will see the water pressure on the manometer located at the bottom of the device There is the filling valve on the right this valve opens slowly and the pressure in the manometer is brought to 1 5 bar and the valve is closed When the device is turned off and on the error information on the screen will be cl...

Страница 16: ...HERMOSTAT SOCKET 2 SAFETY THERMOSTAT SOCKETS 3 PRESSURE SWITCH WATER KIT 4 BOILER TEMPERATURE PROBE 5 BOILER HEAT PROBE 6 CONTROL PANELS 7 12V INPUT 8 220 V OUTPUT 9 CIRCULATION PUMP 10 THREE WAY VALVE CABLE SOCKET 11 TRANSFORMER 12 SAFETY THERMOSTAT 13 INPUT TERMINAL 14 RESISTANCE PHASE OUTPUTS 15 RESISTANCE NEUTRAL OUTPUT ...

Страница 17: ...INTENANCE OF THE DEVICE The following maintenance must be performed by the Authorized Service every year regardless of whether the device is guaranteed or not Water circuit is checked whether there is any leakage if any seal ing is provided Whether the resistances are working is controlled by measuring instrument Check the seals of the resistances Replaced if necessary The safety parts in the devi...

Страница 18: ...ys are not business days This period starts from the date when the product failure is reported to the Authorized Service if there is no service to the seller the dealer the agency representative the importer or the manufac turer company Determination of technical methods to be applied for the removal of the fault and determination of the parts to be replaced belongs to our company only The removal...

Отзывы: