Document 57.4400.7200 - 1
st
Edition 03/2005
INDEX
7
2
TELELIFT 3713 Elite - 4017 - 4514
REPAIR PROCEDURES
7.1
TIME SCHEDULE
Job
Operators
Expected
needed
time (h)
change the ignition key
1
1,00
change the speed switch
1
0,30
change the lights and horn switch
1
0,30
change the overload warning system display
1
0,15
re-calibrate the 3B6 system
1
1,00
change the load cell
1
2,00
change the overload warning system displayand calibrate
1
1,00
change the joystick
1
1,30
change the deadman button
1
0,30
change the joystick movement switch pushbutton
1
0,30
change the brake pump
1
1,00
change the 2 gearbox sensors
1
0,30
change the cardan shaft sensor
1
0,15
change the low boom sensor (only Telelift 3713 Elite-4017)
1
0,15
change the high boom sensor (only Telelift 4017)
1
0,15
change the boom lifting cylinder
1
2,15
change the boom lifting cylinder kit
(complete overhaul)
1
1,30
change the block valve of the boom lifting cylinder
1
0,30
change the cylinder inside the boom (only Telelift 3713 Elite)
1
2,50
change the extension cyl. kit inside the boom (only Telelift 3713 Elite)
1
1,30
change the block valve of the extension cylinder
inside the boom (Telelift 3713 Elite)
1
0,30
change the extension cylinder on the boom
1
1,00
change the extension cylinder kit on the boom
1
1,30
change the valve of the extension cylinder on the boom
1
0,30
change the cylinder re-sequencing valve
inside boom (Telelift 3713 Elite)
1
2,00
change the fork pitching cylinder
1
1,30
change the fork pitching cylinder kit
1
1,30
change the valve of the fork pitching cylinder
1
0,30
change the attachment locking cylinder
1
1,00
change the attachment locking cylinder kit
1
1,15
change the block valve of the attachment locking cylinder
1
0,30
change the outrigger up/down mov. cylinder
1
1,30
change the outrigger up/down mov. cylinder kit
1
1,30
Содержание TELELIFT 3713 Elite
Страница 4: ...Courtesy of Crane Market...