Handing over the Machine and Instructing the Operator
The following checklist should be followed when handing over the machine to the
operator:
1. Operating Manual
Go through the Operating Instructions (page by page) and explain them in detail
through practical training on the machine. Items which are particularly important
include:
– Accident Prevention Regulations published by the employers liability insurance
associations in the users country
– Technical Specifications
– Operator controls, indicating and warning elements
– Checks before putting the machine into operation
– Diesel engine running-in instructions
– Starting and stopping the diesel engine
– Explanation of hydrostatic crawler drive
– Driving
– Recovery and transport of the machine
– Operation of all functions
– Tensioning crawler chains
– Explanation of maintenance intervals and points according to Maintenance and
Inspection Plan by demonstrating and explaining maintenance points on machine
– Lubrication intervals and points of lubrication according to lubrication chart and
demonstration of these points on the machine
– Handing-over of Diesel Engine Operating Instructions
2. Spare Parts List
– Structure of Spare Parts List, Figures and the associated texts
– Instructions for ordering spare parts - always state the type of machine, the vehicle
identification number ("Fz-Id.Nr."), parts designation, complete spare part number,
number of pieces, delivery address, etc.
3. Warranty
– Explanation of warranty offered by manufacturer.
– Explanation of inspection cards and note on maintenance and inspection plan.
– The warranty/handing-over card must be filled out correctly and sent back to the
manufacturer.
Crawler Excavator
TC37
Maintenance and Inspection Plan
(for trained dealer service personnel)
The careful performance of all prescribed inspections is the best prerequisite for the
machines continuous readiness for operation.
The inspections are obligatory. If omitted, this may affect the warranty covered by us.
The following applies to maintenance and inspection work:
• The machine must be thoroughly cleaned before inspection takes place.
• All maintenance work specified should be performed in the prescribed sequence
with the machine at operating temperature.