First Edition • First Printing
Operator's Manual
Inspections
Part No. 1286390GT
RL4LED™ Vertical Mast
23
Raising the tongue for storage or shipping
1
Remove the locking clip and pin from located in
position (8). This will allow the kickstand to
swing down into the vertical position.
2
Re-install the locking clip and pin into position
(6).
3
Turn the leveling jack handle to fully raise the
front outrigger foot pad.
4
Pull the jack release pin and rotate the tongue
jack into horizontal position.
5
Remove the locking clip and pin located in
position (3). This will allow the tongue to be
raised.
6
Raise the tongue into the light tower storage
and shipping position.
7
Re-install the locking clip and pin removed in
position (3) into position (1). This will secure
the tongue for storage and shipping.
Setup
1
Position the light tower at the desired work site.
2
Chock the wheels.
3
Disconnect the trailer lights and the safety
chains.
4
Open the latch on the trailer hitch.
5
Pull the release pin on the tongue jack and
rotate into vertical position.
6
Turn the leveling jack handle to lower the front
outrigger foot pad and raise the tongue of the
machine enough to clear the tow vehicle.
7
Release the spring pin on the side outriggers
and slide them out into the deployed position.
Make sure the outriggers are locked in place.
Rotate the leveling jack into vertical position.
8
Turn the leveling jack handles to level the
machine. Level the machine using only the
leveling jacks
Note: the outriggers are not designed to lift the tires
of the unit off the ground.
9
Ground the light tower according to
your local electrical code. A
grounding rod is supplied inside the
cabinet and a grounding lug is
provided on the front of the
machine, near the bottom.
Note: This machine should be grounded in
accordance with all local electrical codes. Consult
the local electrical codes or authority having
jurisdiction in the area where the machine will be
used for specific requirements.
Содержание RL4 LED
Страница 49: ......