Compact Track Loader
12. Undercarriage Disassembly and Assembly
12-9
Figure 12-32B
Sprocket Roller Installation
Figure 12-33
1.
With the drive sprocket rotated to the desired
position, position the composite roller and steel
pin in the drive sprocket.
Figure 12-34
2.
Insert the sprocket roller bolt from the rear.
Torque to 62 ft. lbs.
Sprocket Removal and
Installation
The tools required for sprocket removal and
installation are listed in table 12-5 below. Use
manufacturer-recommended tools whenever
possible.
Sprocket Removal
Table 12-5
1.
Remove the sprocket bearing plate as described
on page 12-7.
Figure 12-35
2.
Install the puller by positioning the push bolt into
the end of the sprocket shaft and then threading
the puller bolts into the holes in the fac e of the
drive sprocket. (fig. 12-35 & 12-36).
Figure 12-36
Required Tools
Socket Wrench
Impact Driver
Sprocket Puller
Puller holes
Содержание PT-30
Страница 1: ...PT 30 Part Number 2010 513 Printed 1 11 Service Manual Compact Track Loader ...
Страница 2: ......
Страница 3: ......
Страница 7: ......
Страница 13: ...1 6 ...
Страница 15: ......
Страница 19: ......
Страница 35: ......
Страница 51: ......
Страница 65: ......
Страница 73: ......
Страница 85: ......
Страница 99: ......
Страница 103: ......
Страница 115: ......
Страница 116: ...Terex Construction Americas 8800 Rostin Road Southaven MS 38671 888 201 6008 662 393 1800 www terex com ...