Operator's Manual
Second Edition • First Printing
Inspections
20
Genie Superlift Contractor
®
Part No. 1314196GT
Function Tests
1 Select a test area that is firm, level and free of
hazards.
Note: Ensure the carriage hold-down bar is
not over the carriage.
Setup
Machines Without Stabilizers
1 Remove the leg retainer pin and lower the leg
to the down position. Insert the pin through the
leg and base.
Machines With Stabilizers
1 Push down to release the
stabilizer lock plates and lower
the stabilizers until the casters
are in full contact with the
ground. Be sure the stabilizers
are locked in the down
position.
2 Remove the leg retainer pin and lower the leg
to the down position. Insert the pin through the
leg and base.
Load Handling Attachments
Standard Forks and Standard Fork Options
1 Place the forks inside the carriage.
2 Insert the retaining pin.
Load Platform with Standard Forks
1 Place the load platform on the standard forks.
Pipe Cradle
1 Attach the pipe cradles to the forks. Be sure
the fasteners are tightened.
Fork Extensions
1 Slide each extension tube onto the forks.
2 Adjust to the desired position and insert the
retaining pins.