First Edition • Third Printing
Operator's Manual
Operating Instructions
Part No. 1274724GT
S
®
-40/45 XC
™
• S
®
-40/45
HF • S
®
-40/45 TRAX
™
69
Installation of Padding
1 Install the 2 pieces of padding on the platform
rails. Position the padding to protect the
panels from contact with the platform rails.
Installation of Strap
1 Open the clamp and install it around a vertical
platform rail tube.
2 Insert a bolt with a washer through one side of
the clamp.
3 Install the strap assembly end plate onto the
bolt.
4 Insert the bolt through the other side of the
clamp.
5 Secure with a washer and a nut. Do not over-
tighten. The strap assembly end plate should
be able to slide on the platform rail.
Panel Cradle Operation
1 Secure both panel cradles to the platform.
2 Place the load so that it rests in both panel
cradles.
3 Center the load on the platform.
4 Secure the load to the platform using the
strap. Tighten the strap.
Содержание Genie S-40 HF
Страница 90: ......